PC Class 90 Announced :)

Discussion in 'TSW General Discussion' started by MJCKP, Oct 9, 2025.

  1. Jpantera

    Jpantera Well-Known Member

    Joined:
    Apr 6, 2019
    Messages:
    1,530
    Likes Received:
    3,331
    DVTs were to save attaching and detaching locos time, capacity, workload and cost at West Coast destinations. Not for any particular type of loco. The 90s were designed for mixed traffic use which as sectorisation took its hold became less likely for individual locos as a sector would be allocated for each. Hence the first batch being IC, middle batch was Parcels and last the Freight. The locos main aim was to eliminate the 81s/85s and allow some 86s to go East Anglia. Also in 1991 Speedlink freight was abolished so the 90s already had lost some work. If Intercity wanted rid of the 86s and 87s (both still in the heavy maintanence cycles and long term strategies of the time) then many more 90s would have been needed. BR was run on a shoestring and wouldnt have probably ordered the 90s had 81s and 85s been younger and /or East Anglia not been wired....
     
    Last edited: Jan 21, 2026 at 2:10 PM
    • Like Like x 4
  2. Wivenswold

    Wivenswold Well-Known Member

    Joined:
    Dec 15, 2017
    Messages:
    2,059
    Likes Received:
    3,806
    I still find it strange that such an Intercity outpost like the Anglia mainline become part of Intercity and thus it carried-on using locomotives on such a short mainline. I suppose when planned Norwich and Norfolk were seen as a mostly leisure destination but thanks to high property prices in the South East and "the sparks effect" there was a surge in commuter traffic from Suffolk and Norfolk through the late 80s/90s.

    I'll have to read Ian Cowley's excellent "Anglia East" book which chronicled the electrification from Colchester to Norwich. Maybe I'll find the reason but you really could make a case for the newly refurbished 309s covering Norwich services, they weren't that much older than the 86s and Mk2s that we had and were perhaps underutilized on the sub-100mph Clacton branch. If East Anglia had been given to Network South East we would surely have seen an AC version of the Class 442 "Flying Pigs" in Norwich.

    Anyway, sorry, I drifted from Class 90s there.
     
    • Like Like x 2
  3. Phil47569

    Phil47569 Well-Known Member

    Joined:
    Mar 26, 2024
    Messages:
    295
    Likes Received:
    504
    Don't forget that the Class 93 as part of the Intercity 250 project would have primarily replaced the 87s and some 86s (the ICXC 86 fleet would have been replaced by the 87s or 90s) but John bastard Major's privatisation killed that off.
     
  4. sheep#5915

    sheep#5915 New Member

    Joined:
    Tuesday
    Messages:
    3
    Likes Received:
    6
    To be fare all government administrations have never really been pro rail. Apparently the northern powerhouse has been kicked down the road AGAIN!
     

Share This Page