Has anyone completed this scenario ? I'm at the point where it says in the scenario to wait 5 minutes for the breaks to fully release then a marker will show before setting off. I've been waiting 11 minutes and the message hasn't changed. I checked youtube for this scenario and found a vid and the author said in the comments ' its a bug, a fix are in the works.' Is this the case ? Thanks
The scenarios for SPG are exactly the same for TSW2020 and TSW2.. I just did this scenario on TSW2020 and completed it first time with the locos the same way I have on TSW2...
I setup the track switches and moved the train without waiting for 5 minutes. Also, I setup all locos as trail (max power and max breaking configuration. Automatic Brake Handle Off, Engine Run Off, Generator Fiel Off, Control Off, Radio On) and only the 1st (frontal) as lead with the Banking COMM On. Engine Run On, Generator Field On, Control On, Distributer Power On, Radio On and from IFD, Feed Valve Set 90, Auto Brake Cut In, Ind Brake Lead.