Speed Limits

Discussion in 'TSW General Discussion' started by steve#7359, Jan 22, 2022.

Tags:
  1. steve#7359

    steve#7359 Member

    Joined:
    Dec 18, 2021
    Messages:
    60
    Likes Received:
    18
    Do the speed limits only change on the gauge "after" the end of the train passes through the signal? I've just noticed distance fluctuations with how long the train is.
     
    • Like Like x 1
  2. thomastl59374

    thomastl59374 Well-Known Member

    Joined:
    Aug 24, 2020
    Messages:
    577
    Likes Received:
    759
    Yes speed limits will go up once the end of the train is past where it goes up e.g going from 20mph to 65mph you need to wait until the rear of the train has passed the speed sign. Speed limits that reduce from your current speed will come enforce from the front. e.g. going down from 65mph to 40mph
     
    • Like Like x 4
  3. steve#7359

    steve#7359 Member

    Joined:
    Dec 18, 2021
    Messages:
    60
    Likes Received:
    18
    Thank you! I noticed that from the increase vs. decreased limits. I thought that's what was going on.
     
    • Like Like x 1
  4. Hiro Protagonist

    Hiro Protagonist Well-Known Member

    Joined:
    Apr 18, 2021
    Messages:
    482
    Likes Received:
    476
    Think of speed signs/limits as being indicators of "zones". The speed limit which applies to the train is the lowest of whichever "zone" any part of the train is in. Long freight trains, or when going across points or in yards can sometimes span multiple "zones" - you could have a 50-car long freight train changing from one mainline track to another, so that the lead loco is in a 60mph zone and the caboose is also in a 60mph zone but because the middle of the train is going over a set of 15mph points, the limit applied to the whole train is 15mph
     
    • Like Like x 4
  5. Ghostface1701

    Ghostface1701 Well-Known Member

    Joined:
    Mar 23, 2021
    Messages:
    121
    Likes Received:
    250
    One notable exception to this rule is on the London Underground, where the speed limit applies as soon as the front of the train passes the speed board. I didn't realise it was a thing until DTG updated BKL to reflect this accurately.
     
    • Like Like x 3
  6. solicitr

    solicitr Well-Known Member

    Joined:
    Jun 20, 2020
    Messages:
    11,899
    Likes Received:
    18,257
    The Tube can do that because all the trains are of a set length, so they know where to place the speedboards.
     
    • Like Like x 5
  7. marcsharp2

    marcsharp2 Well-Known Member

    Joined:
    Nov 18, 2019
    Messages:
    1,490
    Likes Received:
    2,645

    Except for north of Queens Park when the track is shared with Network Rail, the speed limit changes once the rear of the train passes the speed board.
     
    • Like Like x 4
  8. marcsharp2

    marcsharp2 Well-Known Member

    Joined:
    Nov 18, 2019
    Messages:
    1,490
    Likes Received:
    2,645
    I don't know if other trains have it but the Class 66 has a button in the cab, You press it when you pass a speed board indicating a higher speed and it beeps once the last wagon/carriage passes the speed board.
     
    • Like Like x 4
  9. steve#7359

    steve#7359 Member

    Joined:
    Dec 18, 2021
    Messages:
    60
    Likes Received:
    18
    What is that button called whenever you hover over it with the cursor?
     
  10. marcsharp2

    marcsharp2 Well-Known Member

    Joined:
    Nov 18, 2019
    Messages:
    1,490
    Likes Received:
    2,645
    It's this one you want. Sometimes it'll beep a few seconds after the end of your train will pass but it will beep regardless of your train speed, Just press it when you pass a speed board for a higher speed limit.
    20220123_212831.jpg
     
    • Like Like x 4
  11. steve#7359

    steve#7359 Member

    Joined:
    Dec 18, 2021
    Messages:
    60
    Likes Received:
    18
    Nice! I was wondering what that button was for. Thanks!
     
    • Like Like x 1

Share This Page