PC Harlem Line Graphical Errors

Discussion in 'TSW Troubleshooting & Issues Discussion' started by Monder, Mar 31, 2022.

  1. Monder

    Monder Well-Known Member

    Joined:
    Aug 14, 2019
    Messages:
    2,617
    Likes Received:
    8,066
    During one run I have gathered a couple of graphical problems on the Harlem Line I wanted to share.

    Trains clipping with platforms on balloon tracks have been mentioned already, but worth throwing that in.
    [​IMG]

    On approach to GCT at the beginning of the tunnel the most right line clips through the train - this definitely should have been caught in testing as it clips all the way into the cab.
    [​IMG]
    [​IMG]

    The freight AI trains while being very cool and welcome addition clip significantly with the Harlem River bridge.
    [​IMG]
    [​IMG]

    Some stations have 3D snow piles during winter improving the overall visuals - again great addition, but I guess they're made as an asset that is hidden underneath the route and brought up during the right conditions. This run was nearly 10am in mid-may with light clouds, so definitely no snow, but the piles were probably not low enough and poked through the map.
    [​IMG]
    [​IMG]
     
    • Like Like x 2
  2. Mattty May

    Mattty May Guest

    The ‘attention to detail’ is exquisite.
     
    • Like Like x 1
  3. Monder

    Monder Well-Known Member

    Joined:
    Aug 14, 2019
    Messages:
    2,617
    Likes Received:
    8,066
    I have no illusion you can catch all problems a route has before releasing it to thousands of people... but these seem really basic. And I've not even mentioned the numerous trees going through the cab.
     
    • Like Like x 2

Share This Page