So playing job CSX Q436 at the end about 260 yd before your stopping point you get stuck at a red (framingham station) light doesn't change i tried different locos speeding not speeding tried 4 times every time signal is red any one actually done this.
Yes, I completed Q436 without any problems. Due to the many gradients and the weight of the train, I never went faster than 30 mph to stay within the effective range of the dynamic brakes. This may have affected the timetable and prevented me from getting a red signal.
When i played Q436 { see my post in the MBta boston route feed back thread} I tried it on x box series x and got the red signal its a bugged glitched run checked the switches at the control point they all mislined , also 2 mbta trains stuck too and wont move due to the mislined switches DTG needs to look into it, it happening on consoles some say it completeable on PC