Currently, I found my fun building OHLE in the field of sidetrack area in Heidelberg (Start/End of the Map)
Small Update from Heidelberg. I can say there is everything electrified from the beginning of the Map over Track 10 Heidelberg Hbf till HD-Kirchheim / Rohrbach or in other words the branch to the main route (Rheintalbahn) is electrified.
The pictures look great. Keep up the good work with your track, I'm delighted that you're building something like this.
I live in an attic room so it is very hot there, I was only able to work very little. But, I built OHLE from HD-Kirchheim/Rohrbach till St.Ilgen-Sandhausen and modelled platforms for St.Ilgen and Sandhausen, they need some rework and nice textures but I like it Fresh built Soundproofing looking in direction to Wiesloch-Walldorf St.Ilgen Sandhausen with the new platforms
I was hard-working the last days and built OHLE till entry of Wiesloch-Walldorf Here some Pictures in St.Ilgen "Vorsignal in 175m"
I truly admire the work you’re doing and always look forward to any updates. Thanks so much for your dedication!
Thanks for your support! We really appreciate it. We have reached a point where we have already built far too much to stop and we are really proud of the current state
Grass in Heidelberg? Under the Montpellierbridge and at the left the Heidelberger ESTW (Electronic interlocking system)