Lirr 2.0 Atc And Acses Test

Discussion in 'TSW General Discussion' started by rockstarboy#6217, Jul 27, 2024.

  1. rockstarboy#6217

    rockstarboy#6217 Member

    Joined:
    Jun 25, 2021
    Messages:
    16
    Likes Received:
    53
    Does anyone know how to work these? Its been a mystery every since I first got the routes
     
  2. west coastway trains

    west coastway trains Well-Known Member

    Joined:
    Feb 14, 2023
    Messages:
    768
    Likes Received:
    1,160
    follow the lower speed limit shown in the cab. acknowledge whenever it beeps. i think there’s a manual which goes into greater detail but that’s the crux of it. once you get the hang of it it’ll be a breeze
     
  3. oblatecoconut

    oblatecoconut New Member

    Joined:
    Apr 28, 2024
    Messages:
    8
    Likes Received:
    9
    For the ACSES departure test:
    1. Set the master controller to min brake, then activate the test.
    2. Press Acknowledge, after a few seconds, the track speed indicator will display a 3
    3. Acknowledge again, the number changes to 4, and beeping starts
    4. Acknowledge again, after a few seconds, the train will dump, and the number changes to 5
    5. Move the master controller to max brake, then acknowledge again. Then number will change to 6
    6. Move the master controller out of max brake, then back into it, to trigger the auto recharging of the brake pipe
    7. When the brake pipe is fully charged, move the controller back to min brake, then repeat steps 2-5 to complete the test
    As for the ATC daily test, I still haven't figured that one out myself
     
    • Like Like x 2
    • Helpful Helpful x 1
  4. rockstarboy#6217

    rockstarboy#6217 Member

    Joined:
    Jun 25, 2021
    Messages:
    16
    Likes Received:
    53
    I know how they work and how to work with them, but its the ACSES departure test and ATC daily test I'm talking about.
     
  5. rockstarboy#6217

    rockstarboy#6217 Member

    Joined:
    Jun 25, 2021
    Messages:
    16
    Likes Received:
    53
    Finally, I've done it. Thank you kind sir/ma'am
     
    • Like Like x 1
  6. nlitement

    nlitement New Member

    Joined:
    May 3, 2020
    Messages:
    2
    Likes Received:
    0
    Found it in the LIRR Train Handling and Equipment Manual, "AUTOMATIC SPEED CONTROL DEPARTURE TEST (ASCDT)", page 9:
    So the in-game steps for a "cold" EMU are:
    1. Master Key: On
    2. Reverser: Forward
    3. Master Controller: Max Brake - wait for brake pipe pressure to reach 130+ psi.
    4. Master Controller: Min Brake
    5. ATC Daily Test button will show "Ready" in the left hand display unit. Click on ATC Daily Test. ATC Daily Test button will show In Progress.
    6. The ADU will display 80. Acknowledge.
    7. The ADU will keep illuminating different speeds. Acknowledge each one.
    8. Finally, when the ADU shows 15, Acknowledge and wait.
    9. The screen on the right will show and overspeed warning and will apply brakes. Once Brake Pipe pressure goes to 0, Acknowledge. The ATC Daily Test button will show Passed.
    10. Finally, remember to set Master Controller: Max Brake to recharge the brakes after the test.
    Video showcase:
     
    Last edited: Mar 16, 2026 at 6:32 PM

Share This Page