Route Medway Valley Line Feedback Thread

Discussion in 'Player Feedback' started by DTG Alex, Mar 26, 2026.

  1. Strat-tastic

    Strat-tastic Well-Known Member

    Joined:
    Jan 19, 2024
    Messages:
    698
    Likes Received:
    627
    Try putting it in neutral and waiting for the time out.
    Might work...
     
    • Like Like x 1
  2. Southern Driver

    Southern Driver Well-Known Member

    Joined:
    Aug 20, 2020
    Messages:
    518
    Likes Received:
    982
    If it’s TPWS v4 you have to press brake release and then whatever it is that it’s saying you’ve done.
     
    • Like Like x 1
  3. historicalduck7

    historicalduck7 Well-Known Member

    Joined:
    Mar 21, 2026
    Messages:
    145
    Likes Received:
    267
    xbox series x- at wateringbury, the level crossing barriers lower in the wrong order, both on the right hand side of the road and then both on the left hand side of the road. not sure if this got broken by the update because i don’t recall seeing this before
     
    • Like Like x 2
  4. ChiefGlazer

    ChiefGlazer Well-Known Member

    Joined:
    Sep 12, 2025
    Messages:
    187
    Likes Received:
    345
    Xbox Series X - Service 9P13 (AI) but is drivable.

    Gets stuck completely at Chatham, enabling tailbacks beyond Rochester and Strood.

    Delay central
     
    • Like Like x 1
  5. mkrumme

    mkrumme New Member

    Joined:
    Oct 17, 2024
    Messages:
    11
    Likes Received:
    7
    Hi All,

    PC on Steam

    First, let me say this is one of my favorite routes, both here in TSW and in TS Classic. I did not hesitate to get it when it came out in TSW.

    The only route issue I have found is going South into Yalding there is no speed reduction sign or warning ramp when dropping to 30/20 so I sometimes forget and miss the slowdown if I'm not watching the track monitor (now that I think about it, I don't know if the track monitor shows this either. I will have to verify)

    I want to note a couple issues in the 395 timetables which I have not noticed in anything else. Some stops (varies by specific timetable) are set for 30 seconds but the door timer is set to one minute. Some times for stops are incorrect. In a couple instances I noted the Gillingham stop had the same time as the Chatham stop, meaning it was about 4 minutes off the correct stop time. The schedule seems a bit tight, but I would need to compare with a real schedule - and may have something to do with the aforementioned issues.

    The 395 itself has a couple issues as well, but I believe this was borrowed from the Southeaster HighSpeed route so may be a longstanding issue. For some reason, the brakes do not always hold even If I don't do anything. I believe the train also has brake and traction lock in the real for when passengers are loading. This is not happening in this iteration, rather, one must keep the brake on at least minimum even on flat ground or the train starts to move.
     

Share This Page