I started the CRR Extra 3012 south service. I failed to start the banking services of the rear locomotives. I have an F7 in the front and two SD40s in the back. I need advice on how to train this train. Thank you for the advice.
SD40 have banking equipment. which you can press different buttons. Dont know now if if works to other locomotives F7 have same banking equipment but this you cant press any button. Appears to be dead. Yeah Dovetail must tell us how to use DPU engines with F7 engine in front
Found this film, from the 1950s, a 2 day train ride on Santa Fe Super Chief. outube.com/watch?v=R3o9DYgNEP8&ab_channel=PeriscopeFilm
It would be really useful if there was a guide to banking for CRR. I've also had an issue where I couldn't get the rear F7 unit to run with the lead.