I really enjoed these services in TSW 2020, but the new adhesion "physics" broke them in TSW 2. Has this been fixed? I can't be bothered to waste an hour of my time to check for myself, so I was wondering if somebody has already tried it. Is it now possible to climb the mountain? Can it be done at more than 5 km/h?
https://forums.dovetailgames.com/threads/two-trains-on-an-banking-service.44679/ yup 3 locos between the spessart ramp
That's more of a bodge than a fix, but I'll doubt we'll ever get a proper remedy for it. I'll try this 3-loco version...
Note that its two locos to laufach and between Laufach and Heigenbrücken its 3 locos then its two again
Don't know if this bug was there also before RH, but in my test the banking loco doesn't make any noise. It pushes the train because the instruments in the cockpit show that the loco is pushing, but it doesn't make any noise.