I played this service in journey mode and I noticed that it leads me into a depot building which is closed. When I try to drive towards it, I derail. So effectively this service is not completable which in the end means that the journey mode isnt completable to me. How did this fell through the testing circle?
There's another thread on how to complete this one to get the journey tick. You must use one of the clear yard tracks to the east to head south of the building, and then back in. There's no collision on the south side of the building. But be aware of other trains coming in and out of the yard as they will sideswipe you!
do you know if this is a workaround or if that's how we were supposed to complete that from the start?
You can also workaround this by using the siding track on the far West. This is through a building, but you can drive through it completely without derailing. This also removes the risk of being sideswiped by an AI service.
This one is still not fixed after several patches for Boston Sprinter. Edit: The collisions of the buildings you have to go through are disabled. Kind of a fix. Edit 2: Not a fix, derailed after 2 metres into the building. Come on DTG, if you want us to play a service, make it playable.