Unable to complete this run in journey mode since the last instruction is to stable the consist in Stonebridge Park Depot Track #42 - however Track 42 is all ready occupied. Only one track is unoccupied (Leftmost as you approach the depot). Simple fix is to with remove the consist on Track 42 or move final stop marker to the unoccupied track.
Had this too. As far i remember i drove as close as possible to the other train. It recogniced that i was on that track and the service finished. If its not working just couple the 2 units.
Never thought about that action, Novel idea, not worth re-running the service just to get it ticked off the list, but thanks for passing in this out of the box solution!
Well the Route it Self has nice little extras, There are Phones everywhere, on which you can call the signaller to ask for permission. Important in the tube section for crossovers. Same at Stonebridge Park to acces the Mainline. (There were many "Bug Reports" here because people didnt think about that, so the signal stayed red. This is the lambeth north crossover at the Limit of shunt after changing ends. There are direction indicators at each of thos sections, like at elephant castle.
Thanks. I always check with the signaler when presented with a red for any length of time. Also check points and traffic to see the cause. Only give up when the route is two-blocked.