Hey everyone, I´ve got some questions i hope somebody dont mind to answer. 1) RT: First a signaling questions in RT. If there is a yellow signal coming up, as far as i understand under PzB you need to slow down to 85 km/h. Now if under that signal is a 70 speedlimit sign mounted, do you need to slow down 85 or 70? And do you need to be at this speed before you arrive at the signal with the train or can you quickly in a certain time break down to the speed after passing the signal? I get mixed results ingame with that constellation so i´m a bit confused. 2)RT, NEC: Does anyone know under which circumstanes you need to apply which train light? In the GWE manual was explained when you need to have to apply a certain light based on the daytime. Can´t find anything similar for NEC and RT. 3) RT, NEC, GEW: Under which circumstances do you need to sound the Horn, bell? Thanks in advance for any reply
(Q1) Can't answer (Q2) Can't answer (Q3) I use the horn when I'm going straight through stations without stopping and If I'm about to move the train.