1. Lights are stuck at red. Can’t even start the scenario. Tried contacting signaller but can’t. 2. Cannot set up rear two locomotives, so they’re just extra weight
I’m having the same issue on the same service red light is stuck red and the helpers at the rear are just dead weight.
Did you turn on banking comm? I heard (not checked fully) this must be the first step, even before you set control to on.
I did turn banking comms on, but not as the first step, so I'll try that. Still have the issue with the red lights though
Switching banking comms on before doing anything else makes the rear locomotives work, which is good. Still stuck with the red lights though. I can’t believe two scenarios back to back are busted. Very disappointing
I'm having this issue as well. Whatever bug fixes were in the last patch, I guess this wasn't one of them.
Honestly. All it would take is QA enough to see whether they can complete each run in the final product, one time. That's just the standard of releasing a finished product.
I was just playing this service in TSW2. After 10 minutes of waiting at the red signal, I decided to quit and happened to notice that the date in the Esc menu said "1 January 1." Using GodMode, I then set the date to sometime realistic (May of 2019), and the problematic signal immediately turned green. Hope this helps to anyone trying to find the answer to this 4 years later. In hindsight, if you play this service in the Timetable Mode rather that the Journey, the date is auto-set, which is why the service proceeds as normal there.