So I just played a timetable mode on the new New York Penn - Trenton route and all AI locomotives do not have their pantographs raised. Also, the catenary (wires and poles) are completely missing towards the west end of HAROLD Interlocking. (The Long Island portals of the East River Tunnels) I have attached some images below. An ALP-46 passing me by with no raised Pantograph (same thing for the ACS-64) Catenary wires and poles completely missing.
they already said in the previews stream that it will not be fixed on launch day so look for a patch soon