Is there any possibility of completing the existing routes? For example: Paddington to all destinations on the GWR on trains 166 and also in class 43. Incusive lines where you only have driving by only one track, such as Windosor and Thames Valey, departing from Slough and Twyford. At Rapid Transit, proceed to Madgeburg and put the connecting lines on Leipizig. At the NEC, make the total stretch from Boston to New York. Please tell us if we will have this on the consoles, or if it is already in development.
its all about route length tbh, it takes to long to make say Bristol-Paddington and therefore not commercially viable, small add on branch lines may be possible though! It is possible the reading to Oxford could be added too but would probably mean driving the hst to reading getting of and then loading in the reading-oxford section. I like to do the 'worcester' hst runs because in those you get to stop at slough and then start of again rather than doing a straight run...