Ok so if you create a Metrolink scenario in the planner starting at Union Station track 11 it says you can go to Commerce and from Track 13 you can go to Cal State. Is it to much too hope we might get the Orange County and San Bernardino Lines added
I personally think the Metrolink 91 Line to San Bernardino via Fullerton would be a great addition to the sim. There's been much talk on here about a US freight route along with passenger operation (that's not over a big hill like is always done) and this provides the best of both worlds. While the line has been extended all the way to Perris, I'm sure DTG mentality would be to end it at San Bernardino. You could run BNSF freight trains from Hobart, the Amtrak Southwest Chief, and of course the new Metrolink stuff. It would be a great way to introduce the long since requested long distance Amtrak equipment, a P42 and Superliners, and while it would be a little annoying, you could continue your run all the way to Barstow by switching routes once you arrive at San Bernardino. So, it would give the possibility to run LA-Barstow via two routes, unless by some unbelievable string of luck the two routes could be combined in some way. It seems like an awful lot of work was done for Metrolink DLC for only one route while so many possibilities are available.
I agree completely I just hope they give us some DLC with more MetroLink routes or even the Amtrak Pacific Surfliner