DLC Diesel Legends of Great Western Scenario Put a gronk on it 5x03 Coach preparation After starting the scenario, the train immediately derailed and it is not possible to continue.
(COPY AND PASTE) Coach Preperation 5X03 Completed .Only works by starting on foot . Goto GWE/Diesel Legends timetable/on foot start location paddington time 3.15 Begin on foot mode wait the 08 shunter arrives with coachs go to platform in front of the couplig between shunter and coachs Wait, service 1C01 arrives at3.19/45sec and uncoples at 3.20/25sec when you see the uncoupling happen (or at 3.20/30sec) you can then enter the 08 shunter cab and sit down and accept promt to take over service DO NOT touch any controls until 3.22/30sec then set up loco and wait for the 1C01 service to depart at3.22.35 and a futher wait for the red signal to clear at 3.24/40sec you can then complete the service This works in TSW2 TSW3 and TSW4
I see that My work round has been copy/pasted to this post. The original postt could of been found using the search box at the top of the forum page. It is also just a few posts beloww this one as of today in the Gwe Diesel legends 5x03 Coach Preparation Tread and can also be found in the general disscuusion section Tsw 2/3/3 Coach Preparation 5x03 Tread.