There are several yards in the total distance of this part of the network would be 65.63 (40.78 mi). Revenue train trips take anywhere from 23 minutes to 1h:41m. There are 43 stations. Shorncliffe section (north light blue) – 14.2 km (8.82 mi) Doomben section (Purple) – 3.72 km (2.3 mi) Shared track (dark blue) – 11.6 km (7.20 mi) Ekka loop – (Red) 3.91 (2.42 mi) Cleveland section (south light blue) – 32.2 km (20 mi) Points of interest Roma Street Station Merivale Bridge South Brisbane Station Doomben and New Farm Racecourses Services Doomben - Roma Street Doomben - Park Road Doomben - Cleveland Northgate - Park Road Northgate - Roma Street Northgate - Manly Northgate - Cannon Hill Northgate - Cleveland Shorncliffe - Roma Street Shorncliffe - Manly Shorncliffe - Cannon Hill Shorncliffe - Cleveland Cleveland - Shorncliffe Cleveland - Bowen Hills Cleveland - Northgate Manly - Bowen Hills Manly - Shorncliffe Manly - Doomben Manly - Northgate Cleveland - Doomben Cannon Hill - Bowen Hills Cannon Hill - Shorncliffe Cannon Hill - Northgate Shorncliffe Line There are 90 City-bound services per weekday There are 86 outbound services per weekday. 4 trains run per hour, trains per peak hour (every 15 minutes) from Shorncliffe From Northgate train can run as often as 7-8 mins starting at either Northgate or Shorncliffe 2 trains per hour in the off-peak (every 15 minutes) from Shorncliffe https://translink.com.au/sites/default/files/acquiadam-assets/timetables/200810-shorncliffe.pdf Cleveland Line There are 79 City-bound services per weekday There are 75 outbound services per weekday. 4 trains run per hour, trains per peak hour (every 15 minutes) 2 trains per hour in the off-peak (every 30 minutes) Trains at Manly during morning peak can run every 4 then 11 minutes. Some services run express between Manly and Murarrie https://translink.com.au/sites/default/files/acquiadam-assets/timetables/250519-cleveland.pdf Doomben line - Park Road The train runs every 30 minutes Most trains between Doomben and Roma Street, with some continuing onwards to Park Road, one train a day runs onwards to Kuraby, and 2 morning services come from the Gold Coast. There are only a total of 58 services per weekday. As of 1 June 25 trains have started running on Sundays https://translink.com.au/sites/default/files/acquiadam-assets/timetables/250601-doomben.pdf Rollingstock EMU (does not run Airport/ Gold Coast lines) IMU 100 IMU 120 IMU 160 SMU 200 SMU 220 SMU 260 NGR My Other QR lines in this series Ferny Grove - Beenleigh, Brisbane Airport -varsity Lakes (gold Coast) and Doomben Lines Caboolture - Ipswich & Kippa-ring - Springfield
What’s the point of posting long essays about Australian routes when DTG have clearly stated there’s no prospect of access or licensing from the operators any time soon. Not being funny, just saying.
I want to, also am wanting an Australian route as an Australian, dont care at this point if it is licensed or not would rather have a route with no logos then no route.
Well DTG aren’t likely to do anything without a licence or access to get research material, unfortunately. And I don’t think the editing suite is in anywhere a fit state to allow a third party to create anything Australian. Sadly it seems the biggest source for Oz stuff will continue to be N3V Trainz and residual MSTS/Open Rails.
I don't think dtg are willing to put in the money unless they can do most of Australia in one or two trips, the main 3rd party that i could see doing an aussie route would be Union Workshop with them being the closest being based in china or japan, though they have only done Japanese and Chinese routes, best chance for Australia is going to be a Aussie or kiki 3rd party, but like you said the current public editor is bad (i gave it a go trying to make a route and gave up, still dont know how to make a loco in it, i just can't find any tutorials)