Coupling Problems

Discussion in 'PC Editor Discussion' started by genau6502, Feb 4, 2025.

  1. genau6502

    genau6502 New Member

    Joined:
    Jun 7, 2024
    Messages:
    4
    Likes Received:
    0
    Hi all,

    I'm making a timetable for BML and am stuck on a service that joins two 4-car 377s together at London Victoria. I have coupling/uncoupling working successfully at other locations across the map but cannot for the life of me work out why 5R43 and 1R37 cannot couple. I've played around with directions, changed the service that does the coupling, etc etc, but I'm still stuck on a "Stop coupler setup" message in the simulation log:
    LogTSWAI: TS2AIController::LogTargetConditionStatus: [TOD] +15:54:12.650, [TargetSpeedCondition] Stop Coupler Setup, [Service] 5R43, [Location] Lat: 51.49376, Lon: -0.14654, [CurrentVelocity] 0.00m/s, [OtherRailVehicle] RVM_LBN_SN_Class377-4_DMCO_B_C_19, [OtherFormation] 1R37_End

    upload_2025-2-4_18-35-53.png
    upload_2025-2-4_18-36-1.png
    What puzzles me further is that this instruction actually works when I use this timetable in PIE - even if I'm not driving the services and let the AI do it. I've attached datatracks and the uasset so if anyone could have a look it would be much appreciated.

    Thanks
     

    Attached Files:

  2. Isaak

    Isaak Well-Known Member

    Joined:
    Aug 5, 2019
    Messages:
    390
    Likes Received:
    457
    Coupling is bugged. A lot. If it doesn't work, I advise you to search for another solution: another location (different platform...) or not coupling at all. I have spent hours on getting some of the layers on my MSB timetable functional. A functional instruction on one service can be bugged for an identical instruction on the next service. Sometimes it doesn't simulate but does work in PIE (e.g. your case), sometimes it does simulate but doesn't work when PIE. I can only conclude that coupling is unreliable at best.
     

Share This Page