[ATTACH] A semi express Metro North M3A on the way to Grand Central during the snow squall Route: Harlem Line Equipment: Metro North M3A
I notice a bit of an improvement over the default TSW2 LIRR M7 sounds. The new sounds for both the M3 and M7 are very similar to what is featured...
Great to see the audio for the LIRR M7 and M3 has been revamped and the route received some TLC with the new sounds and dynamic weather
I think it is possible for them to extend the Long Island Railroad if they really wanted to, as they extended the Southeastern route that came out...
Thanks, I have tried the above but it did not restore my progress. Unfortunately, it looks like I am going to have to replay the scenarios. I have...
I hope the propulsion of the LIRR m7 gets fixed since it has been broken since it was first released and the audio lag issues that stem from the...
I just launched Train Simulator and it appears I have lost my progress from the career & standard scenarios. Has anyone experienced this? I just...
[ATTACH] Here, we have a full consist on it's way to GCT, originating from Danbury for the morning peak service Equipment: Metro North Shoreliner...
Definitely a great suggestion. I really think the devs can definitely take the route further east atleast to Ronkonkoma at some point. If they can...
Thanks for confirming these issues will be fixed in TSW3. It appears there will be further updates to TSW2 as well while TSW3 becomes the primary...
Do you have the source for that confirmation? If confirmed, then that is ridiculous. While the route looks great, it should have undergone further...
I just tried 3 other services on the Harlem line. I notice at some point along the run, there is an AI train just ahead of the junction or...
[ATTACH] Local and Express Services bound for Penn Station on the LIRR Main Line Route: Long Island Railroad Equipment: LIRR M7
I am not sure if I missed the roadmap notes from previously but I thought I saw the issue with the AI train getting stuck on the track was on the...
[ATTACH] Class 484 arriving at Ryde St. John Route: Islw of Wright 2022 Equipment: Class 484
Thanks for the suggestion. I agree, the PSU could come in handy to use for a new system. To have 1000W sitting and gathering dust while it has...
My PSU is an old sleeper potato. Good ol reliable for 9 years now Motherboard: Gigabyte GA-UD3-970A CPU: AMD Phenom II X4 965 BE @ 3.4Ghz...
I hope AMD plans to release Zen4 for the AM4 platform as well. But if they go the AM5 route specifically, then the cost of building a new computer...
I am actually curious if a core i5 12600KF would suffice for running rail simulation. I am sure it would as I am coming from an AMD Phenom II X4...
Hi everyone, thank you for the suggestions. I really appreciate the advice. Here is my take based on the provided suggestions. Calidore266: For...
I just tried out a career scenario and quick drive scenario. This M7 has more controls than the M7A that came out for the Hudson line. This route...
Hi everyone, I am currently looking for advice/opinions on possible system builds, I am currently in the process of looking to upgrade my computer...
Awesome screens, I am definitely looking forward to this route
What are you referring to? Currently, the NJT Bergen Line is included in the workshop route that was previously posted.
[ATTACH] Evening Peak Express Train arriving at Sharon station Route: Boston Sprinter Loco: MBTA F40PH-3C
[ATTACH] End of the journey. Metro North train completing the end of it's passenger service at Grand Central Terminal Route: Metro North Harlem...
Unfortunately, the LIRR GP38 is no longer in passenger service. I believe they may have been converted into freight equipment for the NY&A. They...
Agreed, if the M3's, C3, DE/DM30, MP15AC, and NY&A GP38-2 are introduced, that can introduce many service patterns and fully simulate the rolling...
I recently heard approximately 80 LIRR M3's have been brought out of storage and put back into service, I believe until 2024 or so. I think they...
I think we may soon see an M3 if this route was ported from TSW. I wonder why they didn't include the diesels as it was heavily requested before
It is good to see this is arriving in Train Simulator but crazy after all the complaints with the TSW version, the route should atleast go further...
This is amazing. So glad to see LIRR finally make it's way to TSC. I can't wait to run this route in. Hopefully it extends east of Hicksville....
[ATTACH] 2 switcher locomotives at idle at the CEMOF Depot Equipment: Caltrain MP15-DC Route: Peninsula Corridor
[ATTACH] LIRR M3 at Hillside Support Facility for maintenance Route: Long Island Railroad Loco: LIRR M3
[ATTACH] MBTA F40PH-3C arriving at Canton Center on a rainy spring evening Route: Amtrak NEC: Boston Sprinter Loco: MBTA F40PH-3C
I just experienced the same thing on PC with train #616. On the PC platform, I was operating an M3 running express from White Plains to...
[ATTACH] Metro North Metropolitan EMU's approaching the Mott Haven WYE. Equipment: Metro North M3A Route: Harlem Line
It will be amazing if they can get the P32AC-DM in TSW2. It should definitely be possible as the devs have the reference material and created it...
So far, TS only has the 59th street abandoned platform, but is missing 72nd and 86th st abandoned platforms. If detail is the focus which is the...
The whoosh sound can be heard at 59:33 of the Harlem Line Preview Stream
Yup, I heard the whoosh sounds from the preview stream
Grand Central Terminal is supposed to be brighter that what is shown. The lighting in the terminal is not far off from what is shown in the...
From the first look at the Harlem Line, I gotta say, the devs did a great job representing the route. As I usually commute along the Metro North a...
Agreed, if this is an indication we may get an LIRR route for TS20XX, that will be awesome
Oh snap, if this is for TSW2, then perhaps it could be part of the Preservation update that is coming to LIRR. But if it is for TS20XX, then...
1. Will there be automated announcements for the Metro North M7A EMU? 2. From screenshots, it appears the PIS utilizes that screens from...
It would be great if they implemented it. The New Haven FL9 had 3rd rail mode working in TS. So far in TS, I try to simulate 3rd rail mode by...
I think it is possible that the Hudson line will come out soon. Back in 2014 when we got the New Haven Line for TS20xx, it also featured Yankee...
P32AC-DM are designed to run in electric mode for approximately 15-20 minutes once moving. Usually, somewhere between the 97th st portal and...
Separate names with a comma.