Yea I don’t know what happened but it hasn’t been the same since tsw3. PIS haven’t been the same,night lighting on some routes are too...
I’m surprised they haven’t been able to duplicate our issues. They must be on a different built than the one we l got
the one in the right must be the last train of the night. . JK you are correct on this. Is a mess that ever since tsw3 has been broken with no fix...
Yea, I think he had mentioned before that he wasn’t interested in working on another contract but for the New Haven line he would do it all day....
Yea I forgot the pricing. But it seems it has gone up since then. I think after the release of tsw3 each individual route has been 39.99 but l...
I don’t think we would get 3 routes for 39.99 this time…….
They only thing we got so far was from JD saying they are still investigating ,devs having not been able to to duplicate which is odd. I noticed...
mml skyhook feedback thread has 46 pages. 2356 replies and counting. Lots of is filler but still at least they communicate. Something DTG should...
I guess is better we found this out before the 700 was released
Here’s the route map from TSC New Haven route [ATTACH] [ATTACH]
I have same issues with zero mods installed , no creator's club content installled. This is on both Xbox X and PC steam.
Is not all services. I thought the same when I tried numerous services and were good until I hit some that weren’t.Not sure if is random services...
I have zero mods, no creators club of anything and I’m having the same issues on Xbox X and PC steam. I did a restart of the service 1G95 and...
So I have zero mods, no creators club of anything and I’m having the same issues on Xbox X and PC steam. I did a restart of the service 1G95 and...
So 1.14G update for Brighton main line was for one service?
I found out by mistake. i had to change my hardrive so i had to re-download everthing, So I didn't check the box for flare's But i did notice a...
I think the second option would be great but I think Penn station would have to be included since that's where Amtrak service would start from...
anyone else having issues
excellent route suggestion. They are speculations about this route which is just that speculation and nothing else. But it would make sense giving...
So with the update for SEHS coming out today we can speculate the arrival is less than a month away. July 11th ?
Does anyone know when the AP sale might happen? Is there one in around July?
Also the Acela would layer in as the M8 would be introduce on the new US route. Again speculating
I think I mentioned this route would introduce the 700/1. The 700/0 would layer in. Anyways is all speculation
I agree. Also for the 700 it has to be a route that they have all required licenses and it depends the year is set. Which I would believe to be...
I do think the 3 routes will include the 700, Acela, and the new German loco on the road map. I don’t see them making the Acela just for two...
This is an know issue and is currently being looked at [ATTACH]
Does DTG have the license for the operator for the class 800/801,LNER?
Yea your FPS does take a big hit
Yea that was it. I recently had to replaced my drive so I had to reload everything. That was it. Thank you
Just notice the M7 trains on LIRR and on Hudson line no displaying on train but lights show on when in cab view. Did something change recently.
They could include oak point yard, hell gate bridge for the Amtrak runs that go to Penn station.It would be another route for the Acela, ACS-64,...
It would make sense.... Matt said it best back in the festival of rail..."Another Route for the Acela, when you got an Acela what you need is more...
Those are good routes. I do wonder NEC NY- New haven... that's a long route with lots of stations (37), 73 miles . .... That would be great. Not...
Let's hope it has something to do or include some M8's or M9's :)
How great would it be if the release of the NYT timetable same day as the US July 4th holiday …..
What ever the routes are DTG has the licenses for the operators. As we know has been mentioned several times that is very unlikely DTG will do...
I'm surprise there hasn't been any big hints. Last year we didn't find out until the day off....... :)
So refresh my memory since I got in late, summer 2020 release was TSW2- Bakerloo, Koln, SPG (announced june 2020??) Summer 2021 release was- rush...
Here's a timetable trip run from Babylon to Grand Central 1 hour 5 minute trip. [ATTACH][ATTACH]
Here's my opinion. The class 700 has been one of the most requested EMU. I don't believe DTG would make it just for one route. I think it will be...
Here's a video of a LIRR M3 front window Babylon to Penn station complete run to show how it would look [MEDIA]
Good morning DTG JD. Would it be possible to move this Thread over to suggestions. Want to keep this conversation going but want to have it where...
Anyone else notice same service head code with different start times. Which one is the correct service? [ATTACH] [ATTACH]
This would be a great route.Does DTG have the license for southwestern railway
Ok so time to have some fun with possibilities for a new LIRR DLC route. So I was thinking instead of redoing a LIRR towards Hicksville why not so...
And don't forget Joe's extensive work to bring the timetable to properly represent the NEC. Which I think it was being worked for a long time.
I think the ultimate goal would be to have a DLC with a complete timetable,proper signaling ,and safety systems that are accurate. Hopefully...
Hopefully they can hired you if they do a future NEW LIRR with 2023 timetable with grand Central Madison station. That would be something. Imagine...
Very well deserved Joe. Really appreciate all the hard work as always. This will be an epic timetable . Can wait until it comes out.
Thanks for sharing. 4 car unit looks great
Separate names with a comma.