Welp, 2024 isn't off to a better start.....
15% is a joke as well. Alot of hardcore US fans on TSC are facepalming at the stock and what's going on with it. HIS couldn't even accurately get...
Terrible choice for a 2nd Metrolink route, not to mention the announcement has no in game shots or video of it. Feels like this was an emergency...
Not really, BNSF's freight heads on a different line, UP has a short part of their main to and from LATC that it runs on, but dont expect much...
Feather River has DTM stock and stuff, big pass. At least Milepost has the decent stuff
Should be a good route for UW to get their feet wet with, nothing overdramatic like their Tokyo or TÅhoku High Speed line
Is supposed to be talked about in the roadmap article.
DE/DM30AC is EMD, there shouldn't be any issues with that. The NY&A is a possibility as that has to go thru the Anacostia Rail Holdings Company,...
Roadmap at the end, which should talk about the LIRR stuff
Its their 1st TSW route, give them a break.
Confirmed, Union Workshop is making the Tadami Line for TSW [ATTACH]
Supposed to be talked about in the roadmap at the end of the stream. [ATTACH]
Huh, Metrolink's San Bernadino Line, wasn't expecting that.... [ATTACH]
One potential hint is this. Union Workshop retweeted the Dovetail Direct post yesterday, their latest post since their TSC Tokyo route from April...
Will say that the BNSF ES44C4 is one of the better modeled units though, just wish DTG picked a better number range for them, only including the...
Bruh, the Playstation trophies literally got leaked a few days ago, its a Long Island Railroad Route, with the route code NYLI
Also, more thought needs to go into each route and how to make routes more in tune to real life. -Clinchfield wasn't bad, but they screwed up...
I will give DTGs props that the mountains are done significantly better than Cajon Pass, but the urban areas are absolutely terrible.
While the chance of it appearing are near zero..... Krauss Maffei ML-4000 [ATTACH] [ATTACH]
Wish some of those lists had an option to rate everything the same, as my lack of care of some things are near zero.
Now Ive heard a rumor from the TSC discord that someone from Caltrain stated that later this year DTG is supposed to visit again to get references...
Then one shouldnt put the word BRAND in front of new
Tehachapi Pass, late 80's or early 1990's Bakersfield to Mojave. -Bakersfield has both the Santa Fe and Southern Pacific Yards. -Mojave has the...
The Genesis loco (AKA the P40DC/P42DC) has been around since the EARLY 1990s! It is NOT a new loco. You are confusing it with the Siemens Chargers.
Using the formation editor, I simulated a late morning run of UP's former RVUVU train from Sun Valley to Palmdale, not too bad of a run, had to...
The CSX Autorack from Sand Patch Grade is also missing.
DTG probably has a good chunk of reference data of the Surfliner equipment, and probably long distance equipment when they visited the Amtrak yard...
DTG usually doesn't go back to back with locations on US routes, so I don't expect those 2 to be the 6 month route.
The low gondola from Horseshoe Curve is also missing
Only cause DTG doesn't simulate everything that should factor into handling a US freight train. Or proper switching scenarios. Or better...
Based on Union Workshops offerings in TSC. YEAH one says that TSCs licensing doesn't effect TSW, but it's a good measurement on what to and what...
Would make decent AI scenery in urban Tokyo though.
Only way that's gonna happen is thru Union Workshop, DTG won't do unbranded trains and JR isn't gonna give DTG a license.
Odd how some people are running into this on such short formations. Only played around with 1 yesterday, basically the defunct UP Rock train from...
After a playstation trophy leak in anther thread, there is no doubt the next route is an LIRR route. The trophy shows that the new route is...
At this point there is no denying the new route is another LIRR route. So basically we are waiting for details on Sunday.
Only real question with the LIRR is a brand new route or a completely redone/extension of the original route.
You also currently can't get TBTs CP SD70ACus right now anyway cause of "store maintenance"
The current LIRR route is terrible and can't handle a timetable update. Its either a rebuilt route or a complete brand new one.
-The announcement of the US route which will either be welcomed or another disappointment in some way, shape or form.
UP runs the larger road power to at least South San Francisco for the Dirty Dirt trains. [MEDIA] [MEDIA] However, it seems like in modern times...
Milepost doesn't count? [ATTACH] [ATTACH] [ATTACH]
Unfortunately, HIS does have TSW plans along with DTM, (and possibly Reppo) So there is a chance in the future that they won't be developing TSC...
He's made 2 posts in the TSW Editor forums but not much else. https://forums.dovetailgames.com/threads/vehicle-template.77654/...
[ATTACH] A Rio Grande Southern train climbs the steep 4% grade of the Telluride Branch. Vance Junction where the Telluride Branch splits off the...
[ATTACH] A loaded Norfolk Southern Coal train from Bailey mine snakes its way down the Manor Branch to the Mon Line on an early morning, where it...
[ATTACH] A Southbound Caltrain train bound for San Jose passes by the empty platforms of College Park Station. The station is a limited service...
[ATTACH] A typical scene in modern day Barstow, the platform at the former Casa del Desierto sits empty as the sun begins to rise on a new day....
Reppo right now is the only bright outlook for US stuff in TSW, I hope he will be able to figure out the editor over time.
Depending on how you look at it. HIS , including Gary, hasn't really been good at receiving critical feedback. Such as this relating to...
Separate names with a comma.