That would be great. New train and time table for Cathcart circle route.hopefully great things coming to TSW3
Hopefully we hear something tomorrow. The latest releases have been announced on Thursdays
I was trying to figure out what location is on tha picture. Also I noticed that the locos looked to be on the wrong sides according to the...
Is definitely the tracks heading west on waverly These is from the TSC Glasgow/Edinburg route[ATTACH]
Why is the night lighting almost nonexistent in BCC. I don’t see street light poles on, there’s almost no lighting at all compare with BRO route....
So is confirmed we are getting both [MEDIA]
Do we know if the route would include both the 385( 3 car) and 385/1 (4 car) variant?
They do look great
This is great. Hope this will also be implemented on the next NEC section of the yet to be officially announced US route
Thank you for the info
Thank you for clearing that up for me. I got the idea for the services from this video. [MEDIA]
I hope that’s not the case….. if I go back and see they had a German and US route for the longest on the roadmap before TSW3 arrived. I don’t...
So I hope Haymarket and Waverley stations include AI to Dublane,Alloa,Dumbarton Central, queen street via,Shotts,via Cumbernald, class43 to...
What a way to end the year. Lots of great things coming in the near future. Need to get my wallet ready……
So it wasn’t that long. The route looks good. Looks like it has room for freight services and hopefully it includes the haymarket depot
I have the route Glasgow to Edinburg in TSC and it wasn’t electrified back then. When did it get it? Route looks to be close to 49 miles
Yea I figured that the type of a rivet route. Hopefully we get a little more from layers or branches
Ok thank you for the info on the brakes. Go to know. The lighting does need to be adjusted. Too bright
My first pick would have to be the Harlem line. Second is the the new timetable of the bakerloo line. third is the SEHS
Not sure if this is already being looked at but PIS on the AI trains don’t work on SEHS, BCC.is this an issue that is known and will it be fixed??...
Couldn’t fit all but these are from the BR425 from Rhein-Ruhr. At you can see the console at 40% looks good versus on the Bremen at not even 1%...
So couple of things I noticed on the BR425 from Bremen. All the lighting from the instrument panel, headlights, tail lights are too bright. Also...
The 425 brakes seemed off. Even at 100% it doesn’t seemed to want to stop. Is this the way is supposed to be?
It seems these days we are getting less and less for more money
Hopefully they’ll announce the US loco and route before it gets leaked. Let’s hope they have learned from this.
I don’t get why wait to announce the routes. Doesn’t make any sense to me.announcing at least a month before release should suffice.what’s the...
That would be great. Hope we get the US route before the end of the year. I’m looking forward to the US route and US loco
Thank you all for reporting all these bugs which I had expected. I’m sorry that it turned out that way but I’m glad I didn’t pull the trigger.
I have the BCC in TSC and even there I found it to get boring after a few plays. And in TSC at least it came with the 350 that was used for the AI...
Even watching the stream I’m already bored.
Another Cathcart type route.and very similar to eastway
Just as an observation why have someone visit all stations and take hundreds of photos to then get them wrong anyway. From what I can tell most of...
BML,SOS,Harlem line, LIRR,peninsular,Boston, SEHS, just name a few ……. Too many routes that have issues and seemed to be forgotten about. I can’t...
It happened to me on steam
CSX and Norfolk southern operate on the NEC so current locos from sand patch and horse shoe curve could layered in the route. Just like BCC is an...
Any update on when the fix for this is coming out? Not being able to do several not even a complete turn from Brighton is just not acceptable.
It happened to me all Xbox X and on PC. First reported months ago still not fixed and at this point don’t believe it has has been acknowledged yet...
The Northeast corridor line from Trenton (57miles) to Penn station is achievable. The can also include the north Jersey coast line from wood...
I would had taken even just the soho yard for the ECS moves
This route is a pass for me. I already own BCC on TSC classic and I found the route to get boring really fast. Even on TSC classic that came with...
So we can assume the new US loco that’s on the roadmap would then be for the the new US route that was put in the roadmap and not for existing...
So I’m not sure if this was already asked or answered but will help to know is DTG still going to make paid content for TSW2 routes that are in TSW3?
I thought it was just me.
Unfortunately I think they would go the easy way and make the easier route for the Acela Washington to Baltimore. Since they keep saying is all...
True your absolutely correct on this
Agree that would be the worse case. But they wouldn’t need to many resources as is a section that doesn’t have much going on
I definitely don’t want the Washington to Baltimore section of the NEC .
Luckily they have the licensing now for NJ transit so that won’t be an issue
Since I think is the Acela loco that will be coming first to the Boston route and think what ever the the new route is one that the Acela can...
Separate names with a comma.