From the NS Handbook: 15.5 "Wat doet u bij een seinbeeldverbetering?" (What to do when the signal aspect improves) - Does the next MAIN signal...
It may be possible it's dimmed all the way down. In red is the gauge light button, selected is the dimmer (round knob) [ this is on PC on the...
Essentialy yes, somewhere between 80kph and 100kph should be reasonable. AI takes it up to 125 it seems. About the 5 under thing, no we don't....
The whole between 85 and 95 seems odd considering freight paths and most freight "Dienstregelsnelheden" are 80kph to begin with. Not sure why they...
The operator does the calculations who then gives it to their drivers along with all the relevant documentation for their train. So in theory the...
Mostly but not quite right: You seem to have misread 19.1 Onverminderd artikel 18 en de door de seinen aangegeven maximumsnelheid is de snelheid...
P (permissive/automatic block) signals default to green unless the block they control is occupied (Red) or they need to display a color/number...
That is correct. On 3 car ICM's the 2 bogies under the power (pantograph) car are motorised, the rest aren't. On 4 car ICM's the 2 bogies under...
To add to this: If you approach a red controlled signal there may be ATB VV "bakens" (markers/balise) at 120 meters, 30 meters and 3 meters. These...
Will the automatic fireman be animated to the point where its physically showing what its doing? Like shoveling coal from the tender to the...
Separate names with a comma.