Long Island Rail Road: New York - Hicksville[ATTACH]
Long Island Rail Road: New York - Hicksville [ATTACH]
Northern Trans-Pennine: Manchester - Leeds DLC Is it Worth the Money? I mean it looks good and all, not perfect, but the route and the trains as a...
Oops, I did it again! Preordered in last minute @Steam. Promissed myself to not buy anymore DLC until prev ones were fixed but...hey... I love...
Invested a lot of Money into TSW buying all DLCs for PC and most to XBOX1. Well well. with the amount of time I´ve been playing, enjoying and...
TS US Classics Edition bought and installing. Too bad I already pre-ordered Ruhr SIeg DLV for TSW...but whatever. I´ll give it a try when out too...
It cant be worse,thats for sure
Well well. Guess complaining and crying wont make things better anyway. It is what it is. Back to my questions about TS2018. Is it worth buying if...
I know that and also agree. But still, why even release NEC in the first place before they got the signals and ATC working? There is no way they...
ATC/ACSES on and obey signals and speed limits I would say no. Sure you can complete any service. I do that too occasionly, without emergency...
To late now not to buy it :(
Tried to be positive but just had it with this tsw bs. Sure it looks rly good and all, but... As it is now its pretty much useless as a train...
I think you may have misunderstood me... I didnt mean control the loco per say from the ladder. More like taking the role of the conductor hanging...
Thanks a lot for clearing that up :) Quite challenging route but thats the way I like it. And NEC is in my opinion the best DLC so far. All...
I use to run services and play around as I like and simply ignore given tasks. Sometimes signals and switches you cant control ruins your day but...
To me it wouldt make much sense at all to cruise throuh New York Penn station in the Talent2 or fire up the AC4400 and haul coal from Paddington....
Wouldnt it be awesome if we could operate the train standing on the ladders on the loco and cars? Would make switching and shunting a whole lot...
When switching tracks the normal procedure is that one get an approach limited/medium aspect, followed by a limited/medium clear at interlocking....
[MEDIA] Interesting guide covering the basic principles behind signaling systems used in the US
Arent you suppposed to start the engine first before switch isolation switch to run and THEN turn on run/gen field/fuel pump -on the cntrl stand?...
No one? Been trying to figure that thing for a while now. Isnt it implemented or am I missing something? Works fine in the AC4400 but in the GP I...
Thats true. But sometimes things happen quite fast and when approaching a signal at 160kmh there might be a problem come to a halt in time. But...
Thats true. After many hours research I find both RT PZB and NEC ATS/ACSES working very well and hasnt really found any bugs at all (apart from...
I would like to be able to pause the simulation and still be able to look around in and outside cab. Would be quite useful when learning signaling...
Tnx for your answers.
I see I wasnt clear enough CSX HH sure is well equiped with signals and signs all over both mainline and yards. Was refering to NEC New York. My...
First post, weeee!!! I've noticed there are no signals/signs at all on any tracks between or in the freight yards. Is this the case also in IRL...
Same happened to me. Both scenarios and tutorials was lited twice. However, completing a scenario seemed to fix it...
Separate names with a comma.