Dtg Should Extend The Length Of The Upcoming Harlem Line To Southeast.

Discussion in 'TSW General Discussion' started by SgtBreadSt1ck, Dec 2, 2021.

Thread Status:
Not open for further replies.
  1. SgtBreadSt1ck

    SgtBreadSt1ck Active Member

    Joined:
    Jan 28, 2019
    Messages:
    70
    Likes Received:
    150
    Currently, the plan for the Harlem Line that was announced on the Roadmap back on 10/30/21 is too short. The line runs from Grand Central Terminal to North White Plains. While this is a good plan, I feel as if it is too short and I think I can speak for others when I say that. This section is only 24 miles long. Personally, I think the line should run further north to the terminus of all electric trains at Southeast station. This would make the line have a length of 53.2 Miles, a little more than double the currently planned length. The line from North White Plains to Southeast would also feature around 10 crossings and very scenic views. It also has the potential to have a P32AC-DM DLC, as some trains run from GCT to Wassaic and requires a locomotive that can run on both third rail and diesel. (Note that you would leave the cab on the Wassaic train at Southeast as beyond Southeast is the diesel section to Wassaic.)

    What do you guys think?
     
    • Like Like x 2
  2. whiteleyaj

    whiteleyaj Active Member

    Joined:
    Aug 21, 2020
    Messages:
    189
    Likes Received:
    192
    At such a short distance it's going to have to mega impressive for me to want to buy it. Although I'm still not buying anything until the ps5 issues are resolved anyway. But I agree far too short.
     
    • Like Like x 1
  3. DTG Natster

    DTG Natster Producer Staff Member

    Joined:
    Sep 2, 2020
    Messages:
    1,554
    Likes Received:
    10,982
Thread Status:
Not open for further replies.

Share This Page