I spent a good amount of time watching the trains pass through the level crossing at Gillingham station, i notice every time the final train completely passes through the crossing, the gates lift almost instantaneously. Usually it would lift up at least 7 seconds after passing through giving time for both the train and public. Perhaps there could be a change to how long until the gates are raised just to give it that more realistic feeling?