I was just having a nose around on here this morning to see what the condition of it was like. It actually didnt look that bad. It's sparse but there are assets along the line. Id run a train along it.
We can hope that, if nothing else, there are programmers at DTG who are doing work on it "in their spare time". I do want to have the entire route available.
I want track 3 so bad, because using existing track pulling 12.000 tons of train, i can't reach 20 mph on westbound climb.