Steam Linke Rheinstrecke: Mainz-koblenz Missing Catenary

Discussion in 'TSW Troubleshooting & Issues Discussion' started by Janosch Flemming, Mar 18, 2023.

  1. Janosch Flemming

    Janosch Flemming New Member

    Joined:
    May 23, 2021
    Messages:
    11
    Likes Received:
    17
    The catenary on the two tracks of the freight yard at Bingen just stops at the western emd of the yard. The poles holding up the wire are there but no actual overhead wire. Then a bit further along the track the poles are missing as well for a bit. When they return as the tracks get closer to the main line (west of Bingen Hbf) the poles are there again but only one out of the three tracks there has overhead wires (the one leading to the main line). But all three tracks are used by the BR110 in service mode and should obviously have catenary.

    There are also no sleepers on the other tracks to the side of the yard.

    This is blatantly obvious in the "Kalter Stahl" (Cold Steel?) freight scenario. You start at Bingen, collect your wagons from one of the tracks without catenary and then drive to Koblenz.
    This is the second time in a row that catenary has been missing from a route on launch and I don't understand how this kind of thing can get through quality control or any kind of testing when it is right there at the beginning of one of the scenarios...
    20230318123042_1.jpg 20230318123325_1.jpg
     

    Attached Files:

    • Like Like x 1

Share This Page