The Lloydbahn goes from Warnemünde via Rostock Hbf, Laage and Waren(Müritz) to Neustrelitz. In Neustrelitz, the Route connects to the Berliner Nordbahn Stralsund - Neustrelitz - Berlin. The Lloydbahn has two tracks and a length of 127 km. Lines: S1 Warnemünde - Rostock Hbf S2 Warnemünde - Rostock Hbf (- Schwaan - Güstrow) S3 Warnemünde - Rostock Hbf - Laage(Meckl) - Plaaz (- Güstrow) RE5 (Rostock Hbf - Güstrow -) Waren(Müritz) - Neustrelitz Hbf (- Berlin - Elsterwerda) IC17 (Warnemünde - Rostock Hbf - Waren(Müritz) - Neustrelitz Hbf (- Dresden) Also there is freight Traffic, mostly to Rostock Seehafen. The RE5 don't go in the Lloydbahn until Lalendorf Ost, instead he is driving another Route via Güstrow. The S1, S2 and S3 drives with the DB BR 442 (Talent 2) The RE5 drives mostly with DB BR 112.1 and 4 Dostos (in Summer 5) or with a BR 445 (Twindexx) sometimes there is a BR 114. The IC17 drives with new KISS trains from the Westbahn.
There is no restriction on length of route in TSW, what is holding it back is the amount of time it would take to produce a route of that length.
Well I think there is a restriction since I don’t think DTG (or anyone) would make a 3,000 mile route, even if they had the time and were willing to spend years of dev time on it.
It would also be too large and would take up way too much space in ur hard drive, even if u had a hard drive with the greatest amount of storage possible.
They could make the longer routes in sections and merge them together as they put out each section of the route. Agreed a 3,000 mile route would be to long, however I would be happy with a route 100-200 miles long.