I would like to put forward this route for TSW as it is one of the newest lines in the world and is of a length that is within reason for TSW. However it is only a two track system with no freight and is not yet fully complete and as such could be offered as part 1 and subsequent upgrade to include a new section. It is a varied route crossing major roads by means of flyover bridges and a gorge n=by a new bridge and other roads by level crossing. In places it also runs alongside urban roads. It has a small but easy to build maintenance depot. The system is electric with simple wiring with both lines being powered from a central post for most of the route https://mauritiusmetroexpress.mu gives you an idea of the scope