Moura Railway Line 1980s

Discussion in 'Suggestions' started by Aussierailfan, Dec 31, 2023.

  1. Aussierailfan

    Aussierailfan Well-Known Member

    Joined:
    Apr 3, 2020
    Messages:
    564
    Likes Received:
    1,018
    About
    The Moura railway line is a railway in central Queensland, connecting several coal mines to the port of Gladstone. It connects the remnants of several lines that previously connected to Rockhampton, originally by a rack railway. The Dawson Valley railway line was built from near Rockhampton, opening in 1898, and the Callide Valley railway line opened in 1917, both having a north–south alignment. In 1953, a spur line opened to serve the Callide Mine, and another to serve the Moura coal mine opened in 1963, both mines shipping coal to Gladstone via Rockhampton, a ~270 km distance. As coal volumes grew a direct line to Gladstone was proposed, and the 151 km Moura Short Line opened in 1968, being the first 'S' (Special) class line in Queensland, with an 18 tonne axle load at the time. It commenced at Graham railway station (in Calliope) on the Monto line, connecting to the Callide Valley line (and the Callide Coalfields) at Earlsfield railway station (in Jambin), and connecting to the Dawson Valley line at Moura Mine Junction, 12 km east of the town of Moura. Before the Moura Short Line opened, the largest QR steam locomotive, known as a Garratt, could haul a 750-ton coal load to Gladstone via Rockhampton. After the line opened, triple headed diesel hauled trains took 4000 ton coal loads direct to Gladstone.

    Rollingstock
    Ran on the line
    [​IMG]

    1270 class
    Years built: 1964 - 1966
    Prime mover: English Electric 12SVT Mk II
    Top Speed 80km/h: (50 mph)
    Tractive effort: 272 - 300 kN ( 61,000 - 67,000 lbf)

    [​IMG]
    1300 class
    Years built: 1967 - 1972
    Prime mover: English Electric 12CSVT Mk II
    Top Speed: 50 miles per hour (80 km/h)
    Tractive effort: 270 kN (60,698 lbf)

    [​IMG]
    2350 class
    Years built: 1973 - 1974
    Prime mover: English Electric 12CSVT Mk III
    Top Speed: 50 miles per hour (80 km/h)
    Tractive effort: 348 kN (78,008 lbf)

    [​IMG]
    2370 class
    Years built: 1975
    Prime mover: English Electric 12CSVT Mk III
    Top Speed: 50 miles per hour (80 km/h)
    Power output: 2550 hp (1900 kW)

    [​IMG]
    2150 class
    Years built: 1978 - 1979
    Prime mover: Electro-Motive Diesel GL26AC
    Top Speed: 80 km/h (50 mph)
    Tractive effort: 286 kN (64,295 lbf)

    May have run on the line not 100% sure

    [​IMG]

    Years built: 1967 - 1969
    Prime mover: English Electric 6CSRKT mark 2
    Top Speed: 80 km/h (50 mph)
    Tractive effort: 185 kN (41, 589 lbf)

    [​IMG]
    1720 class
    Years built:1966 - 1970
    Prime mover: Electro-Motive Diesel 645E
    Top Speed: 100 kp/h (62 mph)
    Tractive effort: 176kN (69,566 lbf)


    [​IMG]
    2100 class
    Years built: 1970 - 1973
    Prime mover: Electro-Motive Diesel 645E
    Top Speed: 80 km/h (50 mph)
    Tractive effort: 286 kN (64,295 lbf)

    [​IMG]
    2400
    Years built: 1977 - 1978
    Prime mover: EMD 12-645E
    Top Speed: 100km/h (60mph)
    Tractive effort: 224kN (50,357 lbf)

    [​IMG]
    2450
    Years built: 1979 - 1980
    Prime mover: EMD 12-645E
    Top Speed: 100km/h (60mph)
    Tractive effort: 224kN (50,357 lbf)


    [​IMG]
    2470
    Years built: 1980 - 1983
    Prime mover: EMD 12-645E
    Top Speed: 100km/h (60mph)
    Tractive effort: 224kN (50,357 lbf)



    [​IMG]
    2170
    Years built: 1982 - 1984
    Prime mover: EMD 16-645E
    Top Speed:100 km/h (62 mph)
    Tractive effort: 286 kN (64,000 lbf)
     

Share This Page