Hi, I've long been a fan of RailCowGirl's youtube channel and her in-cab recordings of her driver view trips trips in passenger and freight trains for years now. The many segments of single rail mainline and dual track mainline between many small towns and the two main cities, mixed with mountains, vallies and long tunnels would make for some very challenging railroading and signaling. I'd buy it! From one end of the country to the other to the other, with stops, is about four and half hours. Now that you've added the RAILPOOL Vectron, you might not even have to build any trains from scratch.. Just the scenery and signalling