New Timetables For Ruhr Sieg Nord (rsn) And Rhein Ruhr Osten (rro) , The Merger Somehow

Discussion in 'Suggestions' started by bobbobberdd, Sep 22, 2022.

  1. bobbobberdd

    bobbobberdd Well-Known Member

    Joined:
    Sep 10, 2020
    Messages:
    1,117
    Likes Received:
    1,568
    As you probably know, Ruhr Sieg Nord and Rhein Ruhr Osten share the same Place Hagen Main Station. Since we'll most likely never be able to convince DTG to connect the two Routes, here's a Solution that might still satisfy People

    Two Routes, One Timetable.

    It's simple, no matter which of the both Hagen you are right now, you will always see the same Services. There could also be Services that go over both Routes.

    An Example, imagine you Start Frieght Service 1A2B Finnentrop-Hagen Part 1 on Ruhr Sieg Nord, on Rhein Ruhr Osten you would then find 1A2B Hagen-Wuppertal Part 2 with exactly the same Train, with the same Wagons, the same length and Weight. DTG could also put a mechanism into the Game that asks you if you want to play Part 2 of this Service, which then takes you directly to the other Route.

    This could also be an Opportunity to make more Services for the Vossloh G6, the BR 363 and it's Cementwagon and the BR155 and it's Orewagon that come as Add-ons of these two Routes.

    Of course, it would also be possible to bring in Layers from other DLC, such as the ICE, BR 101, BR 425 or the Talent 2 for Services of the RB 48 around Wuppertal.

    Thank you for taking the Time to read through this.
     
    Last edited: Sep 22, 2022
    • Like Like x 1
  2. rennekton#1349

    rennekton#1349 Well-Known Member

    Joined:
    Jun 5, 2022
    Messages:
    6,342
    Likes Received:
    4,131
    Joe is going to like work his magic again somehow to make this happen lol
     
  3. driverwoods#1787

    driverwoods#1787 Well-Known Member

    Joined:
    Feb 21, 2021
    Messages:
    9,135
    Likes Received:
    5,640
    Excellent idea overall but this quote by Pennywise Shows on what really needs to happen if RRO RSN are merged with each other
    Basically it means both RRO RSN needs to be merged via Hagen Vorhalle Rangierbahnhof Hump Yard where 363 204 G6 shunt the RSN train to form a RRO freight. Even better merge RRO HRR RSN by building the missing piece Bochum/Dortmund line via Witten basically forming a true network.
     

Share This Page