This is a route I’d like to see in this game. This section of the North Clyde Line would see the Helensburgh and Balloch branches in the West through to Partick via both Yoker or Drumry and then towards Airdrie. I’ll also include the Milngavie (Mull-guy) and Springburn branches in this suggestion. The route uses the following: Class 334 Class 318 Class 320 Formations include: Class 320 3 car or 3+3 Class 318 3 car or 3+3 Class 334 3 car or 3+3 Should be noted that it is common to see a 318 coupled with the 320’s in a 3+3 formation Possible Layers: Class 170 at Anniesland Class 158 at Anniesland Landmarks in this route include: SEC Armadillo, Ovo Hydro and Riverside Museum, BBC Scotland building, Glasgow Science Centre all seen after Partick before the line towards Glasgow Central Low Level branches off. Rangers FC Ibrox stadium can also be seen in the distance past the river Clyde here. Service Patterns (Mon - Sat) include Helensburgh/Balloch - Edinburgh (Non Stop between Hyndland and Dalmuir) Balloch - Airdrie via Drumry Argyle line services via Glasgow Central Low Level (could be playable until Partick) If this was made I would guess that DTG would cut this route back to Bathgate or Airdrie. Or they would give a linear stretch from West to East.