North Wales Coast Line (tfw) Enhanced 2024 - Now Released

Discussion in 'Creation Centre' started by leebrompton, Dec 23, 2024.

  1. leebrompton

    leebrompton Active Member

    Joined:
    Dec 30, 2020
    Messages:
    68
    Likes Received:
    186
    Now available in the Steam Workshop!
    https://steamcommunity.com/sharedfiles/filedetails/?id=3384874833


    Requires:
    https://store.steampowered.com/app/...Wales_Coast_Line_Crewe__Holyhead_Route_AddOn/

    This project is a rework of the 2022 release of the DTG North Wales Coast Line: Crewe - Holyhead Route (TfW) route. It has been achieved using a combination of railway publications, cab view video footage and Google Earth.

    The route now features bi-directional signalling between Flint and Rhyl and also Llandudno Juntion and Conwy, up to date track speeds (using the late 2024 sectional appendix) along with updated signals, siding removals / changes and a few track corrections to help you achieve more out of your scenario building.

    A selection of Quick Drive scenarios in both directions and from multiple locations are included to get you started with exploring the route updates. I will also be rewriting all original DTG scenarios for the route - these will be uploaded when the route is finalised.

    A full list of enhancements is shown below....

    1. Updated track speeds along the main line route.
    2. Signalling upgrades including bi-directional signalling in the correct areas.
    3. New junctions added at Flint, Mostyn and Rhyl (for bi-directional signalling).
    4. Holywell Junction removed - siding is out of use and overgrown.
    5. Updates to track directions - you can now leave P4 at Chester heading towards Shotton.
    6. Missing stop boards added to platforms, new ones added on bi-directional sections.
    7. Whistle board changes and level crossing upgrades.
    8. Missing foot crossings inserted where locations are known.
    9. Track marker additions (no originals of these have been removed).
    10. Track and platform alterations at Rhyl for bi-directional signalling.
    11. Removal of redundant sidings at Abergele and Pensarn.
    12. Additional bi-directional signalling from Llandudno Junction to Conwy - Up line only.
    13. Minor signalling alterations between Bangor and Holyhead.
    14. Vegetation added to out of use sidings in various locations.


    As an additional bonus, using more cab view footage, the line from Llandudno Junction to Llandudno has also been overhauled with corrected speed zones, updated signalling, full barrier level crossings and corrected milepost locations.

    Whilst I have attempted to replicate signals to match what they are in the real world, it has not been possible to do this 100% in the sim because they simply don't exist as a possible signal to use in the route builder.

    This update to the route is essentially completed - it will remain 'non final' in the library whilst tested by other users. Upon fixing any issues discovered - it will then be made final and available for scenario uploading into the steam library.

    Whilst I have undertaken a lot of checking and testing, I would appreciate it if any issues that you find can be pointed out so that I can fix them before the route is made 'final'. Many Thanks.

    I hope you enjoy it. Merry Christmas!

    20241211142106_1.jpg

    20241212120624_1.jpg

    20241212125540_1.jpg

    20241219170530_1.jpg

    20241221185257_1.jpg
     
    • Like Like x 3
    • Helpful Helpful x 1
  2. knuckleshed

    knuckleshed Well-Known Member

    Joined:
    Jul 14, 2024
    Messages:
    441
    Likes Received:
    449
    OMG! I have been waiting for this ever since you posted the first WIP pictures on Facebook!

    Looking forward to trying it out, thank you.
     
  3. leebrompton

    leebrompton Active Member

    Joined:
    Dec 30, 2020
    Messages:
    68
    Likes Received:
    186
    Facebook??
     
  4. knuckleshed

    knuckleshed Well-Known Member

    Joined:
    Jul 14, 2024
    Messages:
    441
    Likes Received:
    449
    Nvm, I mixed this up with another project that's been ongoing for a couple of years.
     
    • Like Like x 1
  5. leebrompton

    leebrompton Active Member

    Joined:
    Dec 30, 2020
    Messages:
    68
    Likes Received:
    186
    As of today, this route is now "final" in the steam workshop so that scenarios can be uploaded for it.

    Many Thanks.
     
    • Like Like x 1
  6. rigsby#3981

    rigsby#3981 Well-Known Member

    Joined:
    Mar 17, 2022
    Messages:
    1,842
    Likes Received:
    3,124
    Brilliant work there. Is that Flint Station too?. I’m not on PC but would love to have a Chester to Holyhead route on TSW.

     
    • Like Like x 1

Share This Page