(abandoned) Philippine National Railways: Luzon System (freeware)

Discussion in 'Content Developer's Area' started by markandrei24, Dec 31, 2019.

  1. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    3 May 2020
    • Marker "Edsa MCC/NSCR NB/SB" changed to "Edsa MCC NB".
    • Temporary removal of Speed Limit markers between Bluementritt and Edsa for Track Speed upgrade and immediately replaced.
    • Speed upgrade from 40-70 km/h to 60-90 km/h in Solis Triangle-Edsa Segment. (1)
    • NSCR Track in España segment remains to 140 km/h for express, but commuter reduced to 120 km/h. Temporary removal of Speed Signs needed, and immediately replaced. (2)

    Notes:
    1. Subject to actual route of PNR about curves. Requires slower speed limit to prevent derailment, due to some tracks not superelevated.
    2. Caution: On QD or Free Roam, it does follow the Primary Speed Limit, not Secondary. Do not exceed 120 km/h if you are in a commuter service, or set the PZB Mode to M (70 km/h.) You can create a scenario if you wish. Once selected the driver train, set the Service Class to "High Speed Freight".

    Warnings/Faults
    • Out of Memory crash at Paco/San Andres area due to user error.
    • Out of Memory crash at Edsa. (Change Track Properties)

    Timeframe: 4:00-6:10 PM GMT+8 Philippine Standard Time
    Route Update Number: 27
    (+2 Updates from 25-26 April 2020. Update 24 will Start on 27 April 2020.)
    Route Size: 3549 KB/3.46 MB
     
  2. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    3-4 May 2020

    3 May 2020 (Follow-up)
    • Track laying and Viaduct laying between the temporary end of NSCR to: Bicutan (Track) and Nichols (Viaduct).
    • New Station: Edsa NSCR Station

    4 May 2020 (8:10 AM-12:15 PM)
    • Platform shortened to 150-160 m. in Bluementritt, España and Sta. Mesa.
    • Terrain Modification needed on tunnel segment of NSCR.
    • New Stations in NSCR: Nichols, FTI and Bicutan.
    4 May 2020 (5:10 PM-8:20 PM)
    • NSCR South Tracks placed until Pacita.
    • NSCR Viaducts placed until Muntinlupa.
    • Platform height adjusted at Bicutan NSCR.
    • New Stations in NSCR: Sucat, Alabang and Muntinlupa.
    • Terrain Manipulation at Alabang Depot.
    • Downloaded ChrisTrains Scenery Pack v4.23. (External link)(Updated Version 4.3x+)*
    *Because the site of ChrisTrains Homepage seems broken (not down). Clicking the Scenery link has no effect. The manual I made in .doc yet was saved. This route requires v4.23 and above.

    Warnings/Faults

    4 May 2020 (8:10 AM-12:15 PM)
    • Out of Memory Crash at FTI-Bicutan Tunneling Section.
    4 May 2020 (5:10 PM-8:20 PM)
    • Out of Memory Crash at Alabang.

    Timeframe: 8:50-9:50 PM (3 May), 8:10 AM-12:15 PM (4 May), 5:10 PM-8:20 PM (4 May) GMT+8 Philippine Standard Time
    Route Update Number: 28
    (+2 Updates from 25-26 April 2020. Update 24 will Start on 27 April 2020.)
    Route Size: 3625 KB/3.53 MB
     
  3. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    4-6 May 2020

    4 May 2020 (Follow-up)
    • Ignore the "External Link" given last night. Use the "Updated Version v4.3x+" link to download the ChrisTrains Scenery Pack (NS Station Objects and Scenery). This route requires v4.31 and above.
    5 May 2020 (8:15-10:50 AM)
    • NSCR New Stations: Pacita Terminal Complex, Biñan and Sta. Rosa.
    • New River detected: Silang - Sta. Rosa River. New bridge to be constructed.
    • Tracks placed until before Cabuyao. (Removed after cannot join track issue at Sta. Rosa this PM shift)
    • Viaducts placed until Sta. Rosa.
    5 May 2020 (5:05-9:35 PM)
    • Temporary removal of Catenary in NSCR Stations in Bluementritt, España, Sta. Mesa, Paco and Buendia.
    • Overhauling Sta. Rosa-Cabuyao Segment of NSCR following Track Glitch in curve during offset.
    • NSCR New Stations: Cabuyao, Gulod, Mamatid and Calamba.
    • Tracks placed until Calamba.
    • Viaducts placed until Calamba and Banlic Depot.
    • Modified speed limits in Sucat to FTI NSCR Northbound.
    • New markers for Gulod, Mamatid and Banlic Depot in the works. More markers to add before importing using TS/RW Tools.
    (Warnings) Unexpected Power Interruption: 9:45 PM GMT+8 Philippine Standard Time in our area
    • Update 29 will be posted last night, but power interruption unexpectedly happen. It returned anytime from 1:00-3:00 AM 6 May 2020.
    • The route was backed up, but the log will be combined with Update 30.
    6 May 2020
    • Preparations for NSCR North Construction at Solis.
    • Temporary removal of signals at Solis.
    • Construction of Banlic Depot Commenced.
    • Adding Marker - Platform at the following NSCR Stations: Edsa, Nichols, FTI, Bicutan, Sucat and Alabang.
    • Extending Marker at Sucat at-grade segment for South Long Haul Services.
    • Guidance from PNR and DOTr-Philippines will be discountinued (Aborted by route builder). It will be based the route in Google Earth instead and actual photos.
    • Installed ChrisTrains NS Station Objects and Scenery Pack v4.31.
    Warnings/Faults

    5 May 2020 (9:30 AM-12:30 PM)
    • Out of Memory Crash at Sta. Rosa. (Viaduct Placement)
    • Out of Memory Crash at FTI.

    Timeframe: 8:15-10:50 AM (May 5), 5:05-9:35 PM (May 5) 9:25 AM-11:20 AM (May 6) GMT+8 Philippine Standard Time
    Route Update Number: 29-30
    (+2 Updates from 25-26 April 2020. Update 24 will Start on 27 April 2020.)
    Route Size: 3748 KB/3.65 MB
     
  4. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    6-7 May 2020

    6 May 2020 (Follow-up)
    • Working on Valenzuela Train Depot.
    7 May 2020 (8:10-11:30 AM)
    • Continuation of work at Valenzuela Train Depot. (Work Completed, Modification if necessary)
    • Modification needed in NSCR South. (External Link)
    Modifications
    • Pasay Road MCC Station removed.
    • Temporary removal of work in Edsa - Calamba Segment, except Banlic Depot.
    • Overhaul Bluementritt - Edsa Segment.
    • Removing Current Tutuban MCC Station. Freight Route will remain available.
    NSCR South Overhaul Status
    • Reworked Solis Triangle, Joining NSCR North and South route.
    • Reworked Bluementritt Segment.
    Affected Areas and Update
    • The current Metro Commuter Service will be discontuinued. Class 158/170/171 is still required, but it will serve interprovincial segments. (Minimum: 4-car Maximum: 9-car)
    • No route building this afternoon. We will continue tomorrow, 8 May 2020.
    Timeframe: 3:30-8:00 PM (May 6), 8:10 AM-11:30 (May 7) GMT+8 Philippine Standard Time
    Route Update Number: 31-32
    (+2 Updates from 25-26 April 2020. Update 24 will Start on 27 April 2020.)
    Route Size: 3355 KB/3.27 MB (This is due to current overhaul of NSCR South).
     
  5. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    8 May 2020

    Marker Update
    • Markers for NSCR South on making.
    • Tabang Marker becomes Guiguinto Station.
    • Guiguinto Marker becomes Tuktukan Station.
    • Current Valenzuela City Marker becomes Valenzuela Polo.
    Log Notes
    • Current MCC line converted to Single Track. Temporary removal of Tracks from España to IRRI. (Including Alabang Depot (Phase 3))
    • Remastering the Current converted line, Importing SRTM Data. (The size grows bigger.)
    • Plans of Current Phase 3 section 4 to be discontinued due to insufficient space to construct. Other phases 5-7 will become 4-6.
    • Some Parts of Phase 3 Section 4 (Ex-Section 5) will be discarded, following the route of North Long Haul.

    Temporary Suspended Building: Reviewing the Markers to add (Phase 2: NSCR North 1, 2, South)
    • The Afternoon Shift of the building is suspended Today. 9 May 2020 Building will also be suspended.
    • Reviewing the markers before proceeding import into TS.

    Test Runs for 9 May 2020:
    • TSG DB BR 425 Expert-Line
    • Class 390 S9BL
    • vR BR 101 Expert-Line (Additional Requirement for Long Haul and Freight)
    • Munster-Bremen (Additional Requirement for Freight: Wagons and vR BR 145 Expert-Line Used)

    Warnings/Faults
    • Out of Memory Crash at Golden City 1.
    • Out of Memory Crash at Sta. Rosa.
    • Out of Memory Crash at Muntinlupa.
    (Delete Loft/Track issue)

    Limitations
    • Due to lack of 8m Platform on side platform, we use the 6m platform instead.
    Timeframe: 9:00-11:20 AM GMT+8 Philippine Standard Time
    Route Update Number: 33
    (+2 Updates from 25-26 April 2020. Update 24 will Start on 27 April 2020.)
    Route Size: 10976 KB/10.7 MB (This is due to current overhaul of NSCR South and SRTM Placement).
     
  6. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    10 May 2020

    8:05-9:20 AM
    • Reworking Bluementritt Station following the OpenRailwayMap diagram.
    • Works for Solis Station-Bound track.
    • Fixed electrification setting at Valenzuela Depot.
    • Small extension of turnback on the end for/to siding or maintenance shop at Valenzuela Depot.
    • Final Review of the Markers before importing.
    4:00-4:40 PM
    • Imported Markers after Finalizing review in Google Earth, OpenRailwayMap and some Resources (External Links)* about the route.
    • Modified a curve at NSCR Tutuban Bound.
    • NSCR South Track layed until España. (Remastering)
    External Links/Resources (.pdf): (1) (2) (3) (4)

    Timeframe: 8:05-9:20 AM, 4:00-4:40 PM GMT+8 Philippine Standard Time
    Route Update Number: 34
    (+2 Updates from 25-26 April 2020. Update 24 will Start on 27 April 2020.)
    Route Size: 10987 KB/10.7 MB (This is due to current overhaul of NSCR South and SRTM Placement).
     
  7. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    11 May 2020

    8:45-10:45 AM

    • Tracks placed until Sta. Mesa.
    • No Superelevation implemented on Sta. Mesa - Paco Segment of NSCR South due to its speed limit 40 km/h. (Same as Bluementritt)
    3:40-6:30 PM
    • Figured out on Sta. Mesa - Paco Segment about superelevation: Place 2 Tracks at the same time if offset tool is not possible.
    • Remastered Stations: Sta. Mesa, Paco, Buendia and Edsa.
    • Removed whistle boards at some locations.
    • Tracks (NSCR South and Temporary Line) placed until Edsa.
    Timeframe: 8:45-10:45 AM, 3:40-6:30 PM GMT+8 Philippine Standard Time
    Route Update Number: 35
    (+2 Updates from 25-26 April 2020. Update 24 will Start on 27 April 2020.)
    Route Size: 11028 KB/10.7 MB (This is due to current overhaul of NSCR South and SRTM Placement).
     
  8. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    12 May 2020

    8:00-9:50 AM
    • Minor Modifications at Bluementritt - Sta. Mesa Segment. (Both Temporary line and NSCR South)
    • Minor Modifications at Sta. Mesa - Edsa Segment. (Temporary line)
    4:00-5:40 PM
    • Start of tunneling works at Nicols Segment.*
    • Tracks placed until FTI.
    • New Station (NSCR South): Nichols
    *Cannot figure out which tunnel asset to use.

    Timeframe: 8:00-9:50 AM, 4:00-5:40 PM GMT+8 Philippine Standard Time
    Route Update Number: 36
    (+2 Updates from 25-26 April 2020. Update 24 will Start on 27 April 2020.)
    Route Size: 11142 KB/10.8 MB (This is due to current overhaul of NSCR South and SRTM Placement).
     
  9. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    13 May 2020

    7:55-10:10 AM
    • Continuation of tunneling works at Nichols.
    • Temporary Testing of embankment lofts. (Berlin - Leipzig route will be required)
    • New Stations (NSCR South): FTI and Bicutan.
    6:45-7:55 PM
    • Adjusted road height at Pandacan.
    • Added crossovers at Bicutan.
    • Added line bound to Metro Manila Subway Project at Bicutan. (Portal only)(Cannot be driven or selected by the player)
    • Terrain adjustment at Sucat. (Where South Long Haul station to be proposed)
    • Tracks placed near Sucat. (NSCR South)
    • Tracks placed until FTI. (PNR Temporary Line)
    • Freight Testing at Ruhr-Sieg Line. (Siegen to Kreutzal with Munster - Bremen vR BR 145 Expert-Line)

    Timeframe: 7:55-10:10 AM, 6:45-7:55 PM GMT+8 Philippine Standard Time
    Route Update Number: 37
    (+2 Updates from 25-26 April 2020. Update 24 will Start on 27 April 2020.)
    Route Size: 11390 KB/11.1 MB (This is due to current overhaul of NSCR South and SRTM Placement).
     
  10. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    14-15 May 2020

    14 May 2020
    • Pocket track for Temporary line placed at Bicutan.
    • Test run of Class 390 GNER S9BL at York - Peterborough route.
    15 May 2020
    • Reconstructed Alabang River.
    • New NSCR South Stations: Sucat, Alabang, Muntinlupa, San Pedro and Pacita.
    • Track placed until Pacita. (NSCR South)
    • Track placed until Muntinlupa. (Temporary line)
    Warnings/Faults

    15 May 2020
    • Out of Memory crash at Buendia (Platform height adjustment).

    Timeframe: 5:25-8:00 PM (14 May), 8:20-11:15 AM (15 May), GMT+8 Philippine Standard Time
    Route Update Number: 38
    (+2 Updates from 25-26 April 2020. Update 24 will Start on 27 April 2020.)
    Route Size: 11438 KB/11.1 MB (This is due to current overhaul of NSCR South and SRTM Placement).
     
  11. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    16 May 2020

    • Applied superelevation at Muntinlupa - San Pedro segment.
    • Reconstructed Poblacion River at Muntinlupa.
    • Removed whistle boards at Alabang - San Pedro segment.
    • Track placed until Sta. Rosa. (NSCR South)
    • Track placed until Biñan. (Temporary line)
    • New NSCR South Stations: Biñan and Sta. Rosa.
    Timeframe: 1:35-2:55 PM GMT+8 Philippine Standard Time
    Route Update Number: 39
    (+2 Updates from 25-26 April 2020. Update 24 will Start on 27 April 2020.)
    Route Size: 11462 KB/11.1 MB (This is due to current overhaul of NSCR South and SRTM Placement).
     
  12. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    17 May 2020

    Notice: Track laying will be suspended temporarily, until all SRTM Data is placed.
    • Reconstructed Biñan River.
    • Constructed Tunasan River.
    • Imported terrain Data in Mt. Makiling area and Batangas (Sto. Tomas and Tanauan City area).
    • Imported markers for: "PNR NSCR Update" (Includes New Clark City (New))
    Limitations
    • Some buildings may not be placed in populated areas due to unavailability.
    • I intentionally limit asset counter per area by 1000, to prevent any crashes when playing the route in populated areas. (NCR and some parts of Laguna, Bulacan and Pampanga)
    • Series Markers in Nueva Ecija to Cagayan Valley area does not clamp to ground once SRTM Data is placed. It needs a Static markers to work. (It will be removed once finished)
    Timeframe: 7:50-9:50 AM GMT+8 Philippine Standard Time
    Route Update Number: 40
    (+2 Updates from 25-26 April 2020. Update 24 will Start on 27 April 2020.)
    Route Size: 20077 KB/19.6 MB (This is due to current overhaul of NSCR South and SRTM Placement).
     
  13. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    18 May 2020

    Terrain Data imported in the following areas:

    10:10-10:30 AM
    • Rest of Batangas
    • Tiaong (Quezon)
    • Candelaria (Quezon)
    • Sariaya (Quezon)

    3:15-6:10 PM
    • Rest of Quezon
    • Camarines Sur*
    • Albay
    • Sorsogon
    • Rest of Bulacan
    • Pampanga
    • Tarlac
    • Nueva Ecija**
    • Nueva Viscaya**
    • Isabela
    • Cagayan
    *Typing error/Incorrectly spelled at the route marker. (Libmanan)
    **Some paint modified at Dalton Pass section.

    Announcement
    No route building on 19-22 May 2020. It will continue on 23 May 2020.

    Timeframe: 10:10-10:30 AM, 3:15-6:10 PM GMT+8 Philippine Standard Time
    Route Update Number: 41
    (+2 Updates from 25-26 April 2020. Update 24 will Start on 27 April 2020.)
    Route Size: 379113 KB/370 MB (This is due to current overhaul of NSCR South and SRTM Placement).
     
  14. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    23 May 2020
    --Warning: Missing Assets--
    The route building will take place today, after suspension last May 19-22 due to emergency trip to Province last May 20-21. Upon return home, UK LED Signals Pack (Which AWS/TPWS magnets to use on this route) gone missing in asset flyout panel. It has on the C: drive. The route building has to be Suspended temporarily until the missing UK LED Signals is fixed.

    Route was backed up last May 18, Update number 41 before the incident happened. (Both in D: Partition of the drive and 32GB USB, in a folder called: PNR Backup Data)

    The updates: (should start today as expected)
    • Track laying of Temporary line until Sta. Rosa.
    • Track laying of NSCR South line until Calamba.
    • Other logs will follow once route buildimg resumed.
    Please see on official News and Updates section about Missing Items.

    This post was sent from a mobile device.
     
  15. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    27 May 2020
    --Missing Assets (Follow-Up)--
    A fix was arrived by DTG this morning and the missing UK LED Signals is fixed. The route building will continue anytime by 28 May 2020 to 3 June 2020.
     
  16. 749006

    749006 Well-Known Member

    Joined:
    Dec 10, 2016
    Messages:
    8,420
    Likes Received:
    2,675
    Any pictures of what you are doing apart from google maps?
     
  17. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    Hi 749006,

    Thank you for supporting this project. xD

    The pictures/screenshots can be found here: https://forums.dovetailgames.com/th...railways-route-development-screenshots.20005/

    If you wish to discuss this route, use here: https://forums.dovetailgames.com/th...future-discussion-and-reporting-thread.19982/

    The pictures that what I am doing as of 29 May 2020 are (Construction will continue today):

    Overview of the route project I am doing:
    PNR Current Project.png

    Overview of depot in my project:

    20200529074928_1.jpg

    External Links/Resources of this route: (1) (2) (3) (4) (5) (6) (7) (8) (9)
    Maps/More Station layouts not in the documents above searched on the route: (1) (2) (3)
     

    Attached Files:

    Last edited: May 29, 2020
    • Like Like x 1
  18. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    29 May 2020
    --Follow-up--
    Route Building will be moved by Tomorrow (30 May 2020) because of:
    1. Possible bad weather this afternoon/evening (6PM Philippine Standard time) in our country.
    2. Backing up TS2020 installation (Including other personal files, videos and Route Backup data and documents) to newly purchased External Backup Drive (1TB).
    This was sent using a mobile device.
     
  19. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    30 May-5 June 2020

    30 May 2020

    9:10 AM-12:15 PM

    • Removed more whistle boards at Sta. Rosa.
    • Temporary Track placed until Sta. Rosa.
    • NSCR South Tracks placed until Calamba.
    • Reconstructed rivers at Cabuyao.
    • New Stations: Cabuyao, Gulod and Calamba.
    • Changed track type to Yard at Valenzuela Depot.
    • Partial depot construction began at Banlic.
    4:05 PM-6:25 PM
    • Full Blast construction of Banlic Depot. (Stage 1)
    1 June 2020
    • Final arrangement of Markers to use in this route.
    • Fixed spelling in "Libmanan" Marker.
    2 June 2020
    • Stage 2 of constructing Banlic Depot.
    • Changed depot exit track.
    3 June 2020
    • Stage 3 (Final Stage) of constructing Banlic Depot.
    • Added washing bay and maintenance yard in Banlic Depot.
    • Changed Gillingham Depot asset to Shed OOC 01 at Valenzuela.
    • Terrain height adjusted.
    • Modified speed limit and line types in Banlic Depot. (Max. 20 kph)
    • Constructed and Completed New Tutuban Station tracks.
    • New NSCR South Station: Mamatid and New Tutuban.
    5 June 2020

    10:30-11:00 AM
    • Fixed allignment of markers at Iriga - Polangui segment.
    • Added missing elevation data in Iriga and Polangui.
    4:55-8:15 PM
    • Preparatory works for NSCR North begins.
    • Temporary track placed until Calamba.
    • Testing NS Bridges at Mamatid - Calamba segment of NSCR South.
    Warnings/Faults

    30 May 2020

    9:10-12:15 PM
    • Out of Memory crash at Banlic/Calamba (Junction to Banlic Depot).
    4:05 PM-6:25
    • Out of Memory crash at Banlic Depot.
    5 June 2020

    10:30-11:00 AM
    • Out of Memory crash at Iriga.
    4:55-8:15 PM
    • Out of Memory crash at Bluementritt.
    Both by attempting the 2D Map to be opened.

    Main Thread Update
    • The Thread and Route Title was changed to: Philippine National Railways: Luzon System starting 30 May 2020.
    • Sorry for delay due to account issue (unknown error during sign-in). It was fixed now.
    • Since 4 June 2020, as my account cannot log in in the forums, Trying TS-MFD (Free download) for extra real simulation during playing (Not just the PNR: Luzon System, also for other routes)(See spoiler below containing compatibility chart. I don't provide it to public what loco configuration. Use RSC/ICE3Pack01 when creating loco configuration, change displays to BR182/OBB 1016 Digital and enable: Ebula Display, MFA/DDI (Traktion/Speed), MTD/DMI. Modify available PZB/LZB, Doors, Pantograph Control, AFB/Cruise Control, etc.)
    • Note that I still continue testing the TS-MFD and suspend route building until the projector I ordered arrived and tested to continue my route I built.
    • Please note beginning July until Mid-October that the route building schedule might disrupt due to moonsoon season in the Philippines.
    • Also note that beginning August until March 2021 that the route building schedule might also disrupt due to Online classes.
    Timeframes:
    • 30 May 2020: 9:10-12:15 AM, 4:05-6:25 PM GMT+8 Philippine Standard Time
    • 2 June 2020: 7:25-9:55 PM GMT+8 Philippine Standard Time
    • 3 June 2020: 7:20-8:35 PM GMT+8 Philippine Standard Time
    • 5 June 2020: 10:30-11:00 AM, 4:55-8:15 PM GMT+8 Philippine Standard Time
    Route Update Number: 42-45
    Route Size: 379760 KB/370 MB

    TS-MFD Compatibility Chart

    Note: The first ones are I customize myself: (Currently owned DLC as of 9 June 2020: )
    All containing "*" are used for scenario operation in PNR Luzon System.

    1. Class 86 (TS-Pro Version)
    2. Class 87 (TS-Pro, WCML Over Shap Version)
    3. Class 170/171*
    4. Class 370
    5. Class 390 (S9BL and Virgin Trains (Retired)*
    6. Class 395 (see London Faversham High Speed)
    7. Class 801 (see ECML South)
    8. CRH1A (Chengdu - Suining and Southwest China High Speed Version)
    9. CRH1E (see Southwest China High Speed)
    10. CRH380A (Including CIT)
    11. CRH380D
    12. CRH2A (Including CIT)
    13. ICE 1 (Not Included in Freiburg - Basel or Munster - Bremen)*
    14. ICE 2*
    15. ICE 3 (ICE 3 Train Only, DLC or Mannheim - Karlsruhe* Version)
    16. ICE T*
    17. ICE TD*
    18. DB BR 423 (S-Bahn Rhein Main)*
    19. DB BR 425 (TSG)(Including Dirty)*
    20. vR DB BR 101 Expert-Line*
    21. vR DB BR 145 Expert-Line (Munster - Bremen Rail Vehicles)*
    22. RSC DB BR 101 (see Hamburg - Hannover)
    23. TGV Duplex (SNCF and Carmillon)*
    24. TGV Reseau (SNCF and Carmillon)*
    25. TGV Reseau Duplex*
    Not owned DLC: (This depends on the preference of the player)
    All containing "*" are used for scenario operation in PNR Luzon System and/or my preferences (As of 9 June 2020 and may add/remove any preferences).

    1. DB BR 442 Talent 2
    2. SBB RABe 523
    3. Scotrail Class 68*
    4. EWS Class 92*
    5. SBB RABe 526 (see Lake Constance Route)
    6. CRH2ATX (see Guiguang HSR Route)
    7. Re 460 SBB and EWIV Bt (see Gotthardbahn Route)
    8. OBB 1016 (RSSLO) (see Brennerbahn Route)
    9. RWA Railjet Advanced
    10. ICE 4
    11. RWA BR 423 (with LZB)
    Use the Philippine National Railways: Luzon System (Discussion and Reporting Thread) if you want to add a train if you want to support the TS-MFD or even play this route or contribute/collaborate to see if a bug occurs on the route. Note that you have to create your own configuration and not overwriting the originals, or even share online. :)
     
    Last edited: Jun 9, 2020
  20. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    14 June 2020

    11:30 AM-12:10 PM
    • Marks the start of NSCR North Construction.
    • Tracks placed until Caloocan.
    • Removed current bridges in use (LGV) to replace with NS.
    • New NSCR Station: Caloocan.
    4:20 PM-5:40 PM
    • Tracks placed until Gov. Pascual.
    • Constructed embankment on Caloocan - Malabon segment.
    • Fences added on embankment sections.
    • New NSCR Station: Malabon.
    Timeframe: 11:20 AM-12:10 PM, 4:20-5:40 PM GMT+8 Philippine Standard Time
    Route Update Number: 46
    Route Size: 379763 KB/370 MB
     
  21. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    15 June 2020
    • Evaluating Catenary to use on NSCR Segment.
    • Signal Testing on Valenzuela Polo. KS Signals will be selected.
    • Constructed Valenzuela Polo Platforms and Canopy, due to the curved station.
    • Track placed until Boundary between Valenzuela and Meycauayan.
    • New NSCR Stations: Valenzuela Polo and Valenzuela.
    • Fixed missing catenary at Valenzuela Depot.
    • Valenzuela Depot line integrated to main line.
    Warnings/Faults
    • Out of Memory crash at Valenzuela Polo. (x2)
    Both happened using the Gradient tool.

    Timeframe: 6:30-8:50 PM GMT+8 Philippine Standard Time
    Route Update Number: 47
    Route Size: 379787 KB/370 MB
     
  22. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    16 June 2020
    11:05 AM-1:15 PM
    • Minor track removal at Valenzuela Depot. (Switchback to Shop and Siding)
    • Track laying until Balagtas.
    • New NSCR Stations: Meycauayan, Marilao, Tabing Ilog and Bocaue.
    • Plotted markers in Google Earth for Freight Route, after the ROW segment from Valenzuela and Apalit not possible to place track.*
    • Embankment placed at Balagtas. 3/4 of fences placed.
    *Actual Plan/Route for PNR Freight still subject to change without notice. Only an own replication and not an actual route/plan yet.

    4:50 PM-8:25 PM
    • Imported markers for Freight Route plotted this morning.
    • Relaying track from Balagtas Embankment segment until Balagtas.
    • Additional track laying until Malolos.
    • New NSCR Stations: Balagtas, Tuktukan, Guiguinto, Malolos South and Malolos.
    • Pond placement at Obando area. (Stage 1)
    • River placement at Meycauayan and Marilao (Stage 1).

    Information about the route?
    The scope of this route what might happen in next 20-30 years of PNR in Luzon. Using all resources available, I did a big project in TS. Actual route/plan still subject to change without notice. Portions of the route made by my own, but not yet an actual plan/route. Some rolling stock substituted due to lack of availability in TS.

    Timeframe: 11:05 AM-1:15 PM, 4:50-8:25 PM GMT+8 Philippine Standard Time
    Route Update Number: 48
    Route Size: 383544 KB/374 MB
     
  23. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    17 June 2020
    • Pond placement at Obando and adjusting terrain. (Stage 2 - Under review on 18 June 2020 AM Time GMT+8 Philippine Standard Time)
    • River placement at Meycauayan and Marilao. (Stage 2 - Complete)
    • River placement at Sta. Maria and Guiguinto.
    Timeframe: 6:40-8:40 PM GMT+8 Philippine Standard Time
    Route Update Number: 49
    Route Size: 383484 KB/374 MB
     
  24. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    18-20 June 2020

    18 June 2020
    • Reviewing Pond Placement at Obando. Some adjustments to terrain needed.
    • Adjusting loft height at Meycauayan River.
    19 June 2020
    • Constructed San Cristobal River.
    • New Bridge added at Banlic (Temporary Line).
    20 June 2020
    • Angat and Pampanga Rivers constructed.
    • NSCR Tracks placed until past Apalit.
    The NSCR Segment of the PNR Luzon System nears Test Runs
    Notes:

    1. The tracks will be placed until San Fernando prior to test runs.
    2. The tracks placed until past Apalit today. On 21 June the tracks will be layed until San Fernando.
    3. Pattern before Testing: Speed Limit modification and post placement, KM Post Placement, Platforms, Platform Canopy, Station Signs, Markers, Signals and Catenary.
    4. Testing of this segment (Malolos - Calamba and Tutuban) will be announced soon.

    Timeframe: 6:40-8:40 PM (June 18), 12:10-8:40 PM (June 19), 4:00-7:10 (June 20) GMT+8 Philippine Standard Time
    Route Update Number: 50-52
    Route Size: 383704 KB/374 MB
     
  25. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    22 June 2020
    --Temporary Notice--
    1. The tracks should be placed until San Fernando yesterday, but unstable internet connection (Everytime I build ranges from 4:00-9:00 PM GMT+8 Philippine Standard Time) interrupted the building. Never attempted yesterday. Last 20 June (See route update 52) it was stopped by 7:10 PM.
    2. Expect delays starting today. If the internet connection is still unstable, Had to depend on my decision to continue or suspend building.
     
  26. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    24 June 2020
    • NSCR Tracks placed until San Fernando.
    • Small river placed in San Fernando.
    • Embankment placed on Apalit - San Fernando segment.
    • New NSCR Stations: Calumpit, Apalit and San Fernando.*
    • Fixed some station platforms not joined lofts: Buendia and Muntinlupa.
    *They are not yet part of the test run segment.

    Works for conditions to conduct test runs complete. Speed Limits, KM Posts, Viaducts, Viaduct Support, Canopy, Signals, and Catenary to work on next.

    Timeframe: 5:15-6:55 PM GMT+8 Philippine Standard Time
    Route Update Number: 53
    Route Size: 383750 KB/374 MB
     
  27. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    26 June 2020
    • Placed platform on LRT Bluementritt Station area, but removed bridges on it.
    • Working on speed limits from Calamba to Malolos. (Part of test run segment)
    Limitations
    • No platform canopy at LRT Bluementritt Station, but viaducts removed and added platforms. due to excessive height to NSCR Tracks above and height needed for catenary.
    Timeframe: 5:45-8:00 PM GMT+8 Philippine Standard Time
    Route Update Number: 54
    Route Size: 383755 KB/374 MB
     
  28. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    1 July 2020

    Series of compatibilty tests commenced. This route will now require Brennerbahn (Tirol: Brenner - Kufstein DLC).

    Tests conducted:
    • Mixing Hamburg - Hannover Tracks with RSSLO Track (High Speed) (Tested at 40 km/h)
    • Mixing Catenary from LGV: Marseille - Avignon or LGV Rhone-Alpes extension with RSSLO (OBB type or FS)
    • New: ETCS Balises.
    • More to follow...
    Same track rules to be use (Hamburg Hannover TR).
     
  29. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    5-6 July 2020 and 29 July 2020
    --Mamatid platform height was adjusted and canopy placement without log between 7-28 July--

    5 July 2020
    • Removed pocket track at Bluementritt.
    6 July 2020
    • Platform heights adjusted at Calamba.
    • Canopy placed at Calamba and Mamatid.
    • Fixed smoothness of gradient on Temporary track at Sta. Rosa.
    • Minor terrain height modifications.
    7-28 July 2020: No route building due to damaged internet wire and unfavourable weather conditions

    29 July 2020
    • Changed canopy used in Double island platforms starting at Gulod. (Calamba changed the same procedure)
    • Platform heights adjusted at: Gulod, Cabuyao, Sta. Rosa, Biñan and Pacita.
    • Canopy placed at Gulod, Cabuyao, Sta. Rosa and Biñan.
    Warnings/Faults
    29 July 2020

    • Out of Memory crash at Cabuyao.
    • Out of Memory crash at Sta. Rosa.
    • Out of Memory crash at Pacita.
    Note: All incidents happened during platform height adjustment. Crashes did not happen at Biñan station.

    Important Announcement:
    1. The track laying will continue next year, January 2021 in compliance with Standard Procedures. August - December 2020 will be reserved for NSCR placement of Station Infrastructures (Canopy, Signs and Platforms), Catenary, Posts, Signals, Magnets and Testing.
    2. ICE 1 will be removed in requirements list for scenarios, replacing them with ICE 4 (If released on Steam) and ICE 3 Velaro D (Expect more than 20 units).
    3. Mixing RSSLO Tracks used in Brennerbahn will be discontinued, due to incomaptible rail. (Can be mixed and driven, did not derail)

    Timeframe: 11:50-11:55 AM (July 5), 7:15-7:35 PM (July 6), 1:45-2:25 PM (July 29) GMT+8 Philippine Standard Time
    Route Update Number: 55-57
    Route Size: 383754 KB/374 MB
     
  30. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    30 July-4 August 2020

    30 July
    • Platform height adjustment at San Pedro.
    • Canopy placement at Pacita and San Pedro.
    4 August
    • Platform height adjustment at Muntinlupa and Alabang (Northbound (North end)).
    • Canopy placement at Muntinlupa and Alabang.
    • Minor platform height adjustment at Alabang (Southbound and Northbound (South end)).
    • Fixed terrain glitches.
    Warnings/Faults
    4 August
    • Out of Memory crash at Alabang.

    New Announcement (4 August 2020)
    The schedule between 4-18 August will only be skeletal. No other works even Platforms and Canopy are finished. May depend on the schedule. (Part of Test run segment Malolos - Calamba)

    Timeframe: 4:55-5:00 PM (July 30), 6:15-6:35 PM (August 4) GMT+8 Philippine Standard Time
    Route Update Number: 58-59
    Route Size: 383755 KB/374 MB
     
  31. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    12 August 2020
    • Minor Platform adjustment at Sucat.
    • Canopy placement at: Sucat, Bicutan, FTI and Edsa.
    Timeframe: 9:25-9:40 AM GMT+8 Philippine Standard Time
    Route Update Number: 60
    Route Size: 383757 KB/374 MB
     
  32. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    17 August 2020
    --New Schedule Update--

    Schedule Notice:
    • Same Schedule will continue until 31 August 2020. Wait until further notice if another extension needed by 1 September 2020.
    • Route Building Schedule will be adjusted, to give way to TSW 2 and TS stream in 21 August 2020 (Launching a Gaming Page since 5 August 2020/Streams launch at 21 Aug)(See Signature Below)
    • I am waiting until 23 August 2020 if further adjustments to schedules to be made.
    • Regular checking on the route if contains any corrupt areas.
    Expected between 18-20 August 2020: (Buendia - Onwards (Towards NSCR))
    • Continous Canopy placement
    • Platform Adjustment* (Spoiler Below: Useful Tip)
    *CAUTION: (Please Read) (Also applies to Scenarios or other building routes in TS)(Known bug)
    During the use of the gradient tool (Mostly platforms) cause crashes (Multiple times happened last 29 July 2020 between Cabuyao and Pacita areas except Biñan). One by one, adjust the platforms on each section where yellow marks placed. Hit F2 (Prompts saving) and select Yes. Repeat this procedure carefully. Most of the time without saving each of the time will crash, dumps with 0xC0000005 Out of Memory. All unsaved data is lost. Sometimes may corrupt the route (Always back up your route folder (Make .rwp using utilities.exe)) and save it into external drive. My route size is currently 374MB in this case. This is also applied by using the Spacebar key when viewing track properties.
     
  33. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    18-27 August 2020

    18 August 2020
    • Platform adjustment at Buendia and Paco.
    • Canopy placement at Buendia and Paco.
    19-26 August 2020
    No Work -- Sorry for any delay.
    Caused by:

    • 21-24 August 2020 - Launch Stream on my Page (See signature below each time I post)
    • 24 August 2020 - Birthday and Start of Online Classes (Expect more delay)
    • 25-26 August 2020 - Emergency in Province (Nueva Ecija).
    27 August 2020
    • Platform adjustment and Canopy Placement at Sta. Mesa, Bluementritt, Tutuban, and Solis.
    Warnings/Faults

    18 August 2020
    • Out of Memory crash at Paco.
    27 August 2020
    • Out of Memory crash at España.
    • Out of Memory crash at Solis.
    Note: All incidents occur during Platform Height adjustment.

    Timeframe: 11:15-11:30 AM, 8:10-9:10 AM GMT+8 Philippine Standard Time
    Route Update Number: 61-62
    Route Size: 383759 KB/374 MB
     
  34. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    7 September 2020
    • Platform height adjustment and Canopy placement at Caloocan and Valenzuela.
    • Platform height adjustment at Meycauayan.
    Notes: Malabon and Valenzuela Polo was not yet part of Platform height adjustment and Canopy placement because it will be part of future station. Modifications soon once constructed in actual.

    Warnings/Faults
    • Out of Memory crash at Meycauayan.
    Timeframe: 5:10-5:25 PM GMT+8 Philippine Standard Time
    Route Update Number: 63
    Route Size: 383759 KB/374 MB (No change)
     
  35. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    12 September 2020

    7:45-7:55 AM
    • Canopy placement at Meycauayan.
    • Platform height adjustment and Canopy Placement at Marilao, Bocaue and Balagtas.
    9:25-9:45 AM
    • Platform height adjustment and Canopy Placement at Guiguinto and Malolos.
    • Rotated and moved points switch at Banlic Depot.
    Notes: Tabing Ilog, Tuktukan and Malolos South was not yet part of Platform height adjustment and Canopy placement because it will be part of future station. Modifications soon once constructed in actual.

    Warnings/Faults

    7:45-7:55 AM
    • Out of Memory crash at Bocaue.
    • Out of Memory crash at Balagtas.
    9:25-9:45 AM
    • Out of Memory crash at Malolos.
    Note: Incidents happen using gradient tool.

    Timeframe: 7:45-7:55 AM and 9:25-9:45 AM GMT+8 Philippine Standard Time
    Route Update Number: 64
    Route Size: 383760 KB/374 MB
     
  36. tfckonek10

    tfckonek10 New Member

    Joined:
    Sep 22, 2020
    Messages:
    2
    Likes Received:
    2
    Hi. I used to build a route from Tayuman to Alabang on "Rail Simulator" years ago. I lost interest as there's not a lot of assets and info on our rail system and google map was not that accurate compared now. Just continue what you're doing and do it in short segments as one of the reasons I stop doing it is I was hoping to do a Manila to Legaspi route then I realised it was too tedious. Good luck and I hope one day I can see your work...:)
     
    • Like Like x 1
  37. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    Thank you for your support. Welcome here xD

    Note: Parts of the route are my own contribution. Rolling Stock, Safety Systems, Speed Limits and Structures were not the same as planned.

    Warning: This route is advised to run in x64 version.
     
    Last edited: Sep 25, 2020
  38. tfckonek10

    tfckonek10 New Member

    Joined:
    Sep 22, 2020
    Messages:
    2
    Likes Received:
    2

    Thank you for your reply. My rig can handle it as I'm into Flight Simming as well. I'm running on I5-9600K GTX1070 16GBRAM. Why, is it out already? Just joined this forum last week as I'm still looking for scenery for the Philippines. Best wishes on your route development!
     
    • Like Like x 1
  39. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    Hi tfckonek10,

    This route was Under Work In Progress (Collaboration Copy yet). Overhauled last May 6 due to more documents available to public discovered. You can collaborate with me here. Works on the NSCR as of Sept. 28. Once finished I will work on the mainline (including long haul and fictional/contributory -- not yet planned high speed). Note: Some parts are only flat terrain from Valenzuela to Edsa.
    Send me a PM on Facebook or here (click on my profile) xD (or I will send you a PM). (List of requirements on the reporting thread -- will be updated if necessary) This route is Free Download. (Collaboration Use Only)(Link TBA)

    https://forums.dovetailgames.com/th...system-discussion-and-reporting-thread.19982/

    All available documents (.pdf and external links in use).

    Watch this video how to collaborate: (Do not attempt on tracks.bin related (tracks, and track-linked objects))



    On making custom objects (scenery only), you need to watch some tutorials on how to use this program, and making a developer folder xD (Here) (Programs needed -- Use TS Tools if necessary) (TS Tools)

    You need to obtain a Google Maps API Key (billing account needed) (Please see in Section 8.5.1 on the user guide/manual.)

    For Blender and 3ds Max. You can ask in this forum or steam forum (General or Content Creation) on how to export objects thru blueprint editor.
     
  40. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    18-29 September 2020

    18 September (Unscheduled Fix)
    • Fixed rough gradient at Bicutan.
    • Fixed broken superelevation at España - Sta. Mesa SB Track.
    • Fixed broken superelevation at Marilao - Meycauayan SB Track.
    29 September
    • Removed Tutuban-bound track from Bluementritt. (Final)
    • Replaced canopy at Double-island platform to Type 1.
    • Replaced canopy at Single-island platform to Type 2 (NSCR Only).
    • Terrain fix on track at Sta. Rosa (Mainline).
    • Removed whistle boards at unconstructed Calamba - IRRI segment.
    • Changed platform to Double island at San Pedro.
    • Viaduct laying at Gulod - Mamatid section. (Not including mulitrack)
    Timeframe: 10:50 AM-12:25 PM GMT+8 Philippine Standard Time
    Route Update Number: 65
    Route Size: 383762 KB/374 MB
     
  41. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    6 October 2020

    Practical and Testing (in Italics):
    • Testing command: L for Lower track to Ground.
    • Testing command: Ribbon Merge.
    • Practice: 3rd Rail (WCML Over Shap Selected).
    • Practice: Auto to Manual Junction.
    • Overhauling FTI - Valenzuela Segment (SRTM Placement at Edsa).
    • Mainline track spacing adjusted to give way to tunnels.
    • NSCR tracks overhauling in progress.
    • Retaining walls placed in tunnels
    • Checking leftover lofts.
    • Roads temporarily removed. (Removed for collaboration)
    • Catenary Testing in FTI Segment. (Not Saved)

    Timeframe: 9:45 AM-1:20 PM GMT+8 Philippine Standard Time
    Route Update Number: 66
    Route Size: 384030 KB/375 MB
     
  42. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    11-14 October 2020
    11 October
    • Removed KHS Tunnels as precautionary measure. (Instances of recent DLC retirements)
    • Removed bridges and roads at Sta. Mesa. (For Collaboration)
    • Placed terrain data in Meycauayan to area.
    • Flattened terrain at Valenzuela Depot.
    • Reworked Valenzuela - Bluementritt Segment.
    14 October (8:00-8:45 AM)
    • Height works on Solis Triangle (Mainline).
    • Relay track on NSCR Solis Area (Southbound Only) and Caloocan to Valenzuela Polo (Northbound Only).
    14 October (3:45-4:10 PM)
    • Relay track on NSCR Caloocan Area (Southbound) and Caloocan to Valenzuela Polo (Southbound NSCR Only).
    • Terrain data placed until Sta. Mesa.
    • Removed Line 2 Track at Sta. Mesa area.
    • Preparations on Bluementritt and Sta. Mesa Segment.
    • Minor terrain fixes.
    Requirements Update:
    • NS Station Objects and Scenery (With ETCS Balises) requires v4.41 and above.
    • Frison scenery objects Parts 1 and 2 needed as requirements. (Not yet installed as of this date. For future logs.)(Link)

    Timeframe: 10:50 AM-12:30 PM (11 Oct), 8:00-8:45 AM (12 Oct), 3:45-4:10 PM (12 Oct) GMT+8 Philippine Standard Time
    Route Update Number: 67-68
    Route Size: 387115 KB/378 MB
     
  43. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    24 October 2020
    • (NSCR) Track relayed in parts of Bluementritt and Sta. Mesa Segment.
    • (Mainline) Track height changed into ground. (Bluementritt Area only)
    Timeframe: 11:46 AM-12:15 PM GMT+8 Philippine Standard Time
    Route Update Number: 69
    Route Size: 387120 KB/378 MB
     
  44. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    10 November 2020
    Unscheduled
    • (Core) SRTM Terrain Placement from Buendia and Paco.
    7:35-8:25 PM
    • (Core) Pasig River water decals removed.
    • (NSCR) Reworked Sta. Mesa - Paco Segment.
    • (NSCR) Reworked Speed Limits.
    • (NSCR) Reworked España Station.
    • (NSCR) Reworked Malabon and Valenzuela Polo Stations (No Canopy and Platform Height Adjustment).
    Warnings/Faults
    • Out of Memory crash at España.
    Notes:
    • (Requirement) NS Station Objects and Scenery Pack updated to v4.45.
    • (Scenarios) Had to create by yourself due to my time constraints. QD Scenarios included.
    • (Catenary) Will be divided in UK/FR/DE/CN Versions. Will be specified once the base pack (current) is complete. Base pack is also available for download once completed, tested and finalized.
    • (FAQ) Updated: Fictional with real-life and planned data. First FAQ will be discarded.
    • (Rolling Stock) TBC once finished. Anything may subject to alteration.

    Timeframe: 7:35-8:25 PM GMT+8 Philippine Standard Time
    Route Update Number: 70
    Route Size: 387832 KB/378 MB (.rwp), 492 MB (522 MB Size on disk) if installed
     
  45. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    14 November 2020
    11:30 AM-12:50 PM
    • (Terrain) Terrain adjustment at Edsa.
    • (NSCR) Reworked Buendia - Edsa Segment.
    • (NSCR) Reworked tunnels at Nichols. (No other assets available except London Faversham. Wall replaced from LGV Marseille Avignon.)
    • (NSCR) Track mid walls placed at Nichols Station.
    4:30-5:40 PM
    • (NSCR) Reworked Edsa Station.
    • (NSCR) Reworked Valenzuela Polo and Malabon Stations.
    • (Mainline) Gradient works from Bluementritt to Pandacan.
    • (Roads NCR) Removed Pandacan Area.
    7:15-7:25 PM
    • (Mainline) Gradient Works at Paco area.
    Warnings/Faults
    4:30-5:40 PM

    • Out of Memory crash at Edsa.
    • Out of Memory crash at Malabon.
    • Out of Memory crash at San Pedro.
    Timeframe: 11:30 AM-12:50 PM, 4:30-5:40 PM, 7:15-7:25 PM GMT+8 Philippine Standard Time
    Route Update Number: 71
    Route Size: 387843 KB/378 MB (.rwp), 492 MB (522 MB Size on disk) if installed
     
  46. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    16 November 2020
    • (Mainline) Gradient works from Paco to Edsa.
    • (Terrain) Terrain tweaks at Makati.
    • (NSCR) Electrification type switched to 3rd rail at Valenzuela Depot.
    • (NSCR) Assembly hall placed at Valenzuela Depot.
    • (NSCR) Junctions at Valenzuela Depot changed to manual and configured.
    Timeframe: 4:00-6:10 PM GMT+8 Philippine Standard Time
    Route Update Number: 72
    Route Size: 387756 KB/378 MB (.rwp), 493 MB (522 MB Size on disk) if installed
     
  47. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    18 November 2020
    • Junctions at Banlic Depot changed to manual and configured.
    • Preparatory track laying works at San Fernando.
    • Added embankment at Apalit at-grade/elevated boundary.
    • Minor terrain tweaks at Bluementritt.
    Warnings/Faults
    • Out of Memory crash at Bluementritt.
    Timeframe: 2:10-2:50 PM GMT+8 Philippine Standard Time
    Route Update Number: 73
    Route Size: 387762 KB/378 MB (.rwp), 493 MB (522 MB Size on disk) if installed
     
  48. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    21-27 November 2020

    21 November (Unscheduled Fix)
    • Smooth gradient fix applied at San Fernando.
    27 November
    • Track laying until Angeles (before reaching Angeles Station marker).

    Timeframe: 3:40-4:45 PM (27 November) GMT+8 Philippine Standard Time
    Route Update Number: 74
    Route Size: 387780 KB/378 MB (.rwp), 493 MB (522 MB Size on disk) if installed
     
  49. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    1 December 2020
    • Track laying within Angeles City. (Did not reach Clark Station marker)
    Timeframe: 8:00-9:25 AM GMT+8 Philippine Standard Time
    Route Update Number: 75
    Route Size: 387793 KB/378 MB (.rwp), 493 MB (522 MB Size on disk) if installed
     
  50. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    1-9 December 2020

    1 December (Unscheduled Fix)
    • Terrain fixes at Bluementritt.
    6 December (Unscheduled Fix-See 1 December log)

    9 December
    • (NSCR) Track height changes at Angeles.
    • (NSCR) Track laying until Clark area.
    • (NSCR) Paco station changed to side platform (2 tracks only).
    • (NSCR) Platform height adjustments at Bluementritt, España, Sta. Mesa and Paco.
    • (NSCR and Mainline) Track layout changes at Paco.
    • (Terrain) Some terrain fixes
    Warnings/Faults
    • Out of Memory crash at España.
    • Out of Memory (hard) crash at Sta. Mesa.
    Timeframe: 4:10-5:40 PM (9 December) GMT+8 Philippine Standard Time
    Route Update Number: 76
    Route Size: 387789 KB/378 MB (.rwp), 493 MB (522 MB Size on disk) if installed
     

Share This Page