Drivers have been reporting a jolt when approaching the Gillingham level crossing, when heading towards Rainham. A track inspection has been carried out and a broken rail has been discovered. A TSR of 5mph is recommend until the track is fixed.
Wouldn't it be great if the routes actually wore out over time & engineering trains were scheduled for us to work
That would be great, a network rail game mode or something along those lines would be a good addition.