Sherman Hill Needs A Motive Power Transfer Job

Discussion in 'Suggestions' started by hostler#4361, Jan 19, 2022.

  1. hostler#4361

    hostler#4361 Active Member

    Joined:
    Jun 1, 2021
    Messages:
    69
    Likes Received:
    119
    On Sherman Hill every SD40-2 job is switching, with the exception of one sand haul. The SD40-2 needs a motive power transfer job from one terminal to the other. With this we could get out on the Hill with a couple of light engines and run the speed limit from one end to the other. It should start on the engine track of one terminal and end on the engine track of the other.
     
    • Like Like x 2
  2. redrev1917

    redrev1917 Well-Known Member

    Joined:
    Jul 22, 2021
    Messages:
    3,645
    Likes Received:
    7,992
    I was actually a bit surprised that we didnt get L/E moves for this route tbh.
     

Share This Page