I know you cannot relece dates however are you able to give any details on what will be included in the second update. Well done on the first one a quick and impressive first fix.
2nd Patch has now released with the patch notes on this thread. https://forums.dovetailgames.com/threads/wcml-south-london-euston-birmingham-update-2.31375/
The notes say that there's another update to come, regarding a broken scenario, but this one seems to cover most of the outstanding problems?
I'll wait and see some user feedback before I re-purchase. No rush as I have the other one. Be nice to have all in one place though, and the AT WCML merge is still planning to use this, so will need it sooner or later.
If you are talking about the Wembley to Willesden area they are not missing but the speed of the 390 means the wires are not rendered in time for the player train - pass thru the area where you think the wires are missing on a local service and see if they are visible
Peter749 I have run the Class 390 and 221 and approx 30 mph through the Wembley/Willesden part of the track and the OHW (and some wire supports) are still not showing/displaying in the simulator. Run the Class 350 at any speed and they do display! It's a mystery! Run on the adjacent 3rd rail track and they do show at any speed.