The lines from London Euston to Watford Junction totals 17 1/2 miles, with Stratford to Clapham and Richmond totalling at 23 1/2 miles, and Gospel Oak to Barking being 11 3/4 miles, with the total length for this route being 52 3/4 miles. If the Barking Riverside extension of the Goblin line was to be included, the route would be 54 miles long. Proposed Rolling Stock Class 172 in London Overground livery Operated services on the Gospel Oak - Barking line Class 350/3 in London Midland Livery Operated all London Midland services out of Euston Class 378 in London Overground (Old) Livery Operated all London Overground services excluding Gospel Oak to Barking Stock layering in from other routes: Bakerloo Line: 72 stock for services between Queen's Park and Harrow & Wealdstone East Coastway: EWS Class 66 for occasional Light Engine moves as well as stock at Wembley Yard Future DLC's DLC for Electrification of Gospel Oak to Barking + Class 710 and Class 378 in new livery Class 66 in GBRf & Freightliner (New) livery + Intermodal wagons for more freight traffic
The TS22 West London Lines and Gospel Oak Barking Line arriving into TSW2. There's a manual for the route using its TS22 version and a TSW2 manual version will need console-specific controls B Xbox Circle PS4/5 AWS