Neckartalbahn: Heidelberg - Neckarelz From Tsg Discussion Thread

Discussion in 'TSW General Discussion' started by gwrfan#3416, Dec 15, 2025 at 2:02 PM.

  1. Puddington Bear

    Puddington Bear Active Member

    Joined:
    Jul 24, 2024
    Messages:
    143
    Likes Received:
    247
    They're improving the steam physics. The article says so and Lukas confirmed it on TSC Discord last night they've been at it for about three months now.
     
    • Like Like x 5
  2. aaronthomas1a

    aaronthomas1a Active Member

    Joined:
    Nov 26, 2022
    Messages:
    190
    Likes Received:
    147
    I saw the map of this to bad this route only few place away from Mannheim and Heilbroon to link up with both routes
     
    • Like Like x 1
  3. lux#4689

    lux#4689 Well-Known Member

    Joined:
    Feb 12, 2021
    Messages:
    450
    Likes Received:
    645
    Bm234 in the shots.
     
    • Like Like x 3
  4. OldVern

    OldVern Well-Known Member

    Joined:
    Nov 2, 2020
    Messages:
    21,571
    Likes Received:
    44,804
    IIRC didn’t they have fabric style seats or in 1974 would they still have been plastic/vinyl?

    In any event, I think this DLC will need a “Sore Bum” achievement for spending more than 30 minutes travelling sat down as a passenger in these coaches!
     
    • Like Like x 2
  5. AmityBlight

    AmityBlight Well-Known Member

    Joined:
    Feb 29, 2024
    Messages:
    770
    Likes Received:
    2,074
    That's something I've been thinking too. Linking the route to Mannheim in the north and Heilbronn in the south would have made for some interesting route hopping opportunities. Just think about how jarring it would be... arriving at Mannheim from K'lautern in a 425 and hopping to the other route to take over a 23. And then changing into a 111 at Heilbronn :D

    But it would also have added a lot of length to the route. I'd rather have a moderate-size but detailed and beautiful route, than a long and barren one.
     
    • Like Like x 7
  6. lux#4689

    lux#4689 Well-Known Member

    Joined:
    Feb 12, 2021
    Messages:
    450
    Likes Received:
    645
    And what would that bring us? According to german forums, the steam trains stopped at Heidelberg and went back ...
    They did not continue on
     
    • Like Like x 1
  7. DominusEdwardius

    DominusEdwardius Well-Known Member

    Joined:
    Dec 8, 2016
    Messages:
    383
    Likes Received:
    605
    The biggest issue with extending to Heilbronn is well, Heilbronn itself. In the era it is enormous and would be something of a nightmare to even do. Ontop of that we don't really want to have a Liverpool Crewe situation where the track consumes so much memory and affects performance considerably that it degrades the final product and just results in empty yards and poor performance or worse crashes. That and the BR23s only actually really worked over the Neckarelz Heidelberg section anyway.
     
    • Like Like x 10
  8. AmityBlight

    AmityBlight Well-Known Member

    Joined:
    Feb 29, 2024
    Messages:
    770
    Likes Received:
    2,074
    OK, those are some good arguments! As I said, I prefer a shorter but well-made route over a longer but lackluster one :)
     
  9. locobilly

    locobilly Well-Known Member

    Joined:
    Oct 1, 2021
    Messages:
    1,271
    Likes Received:
    3,089
    Why is a steam train running under overhead wires?
     
  10. e.leerentveld

    e.leerentveld Well-Known Member

    Joined:
    Nov 13, 2021
    Messages:
    213
    Likes Received:
    426
    Because not every stretch of track was electrified, some services ran with steam engines (until 26 October 1977 in W.Germany). The steam hauled trains would eventually branch away from the electrified section or continue beyond the electrified part..
     
    • Like Like x 2
    • Helpful Helpful x 1
  11. solicitr

    solicitr Well-Known Member

    Joined:
    Jun 20, 2020
    Messages:
    13,780
    Likes Received:
    20,990
    However, this is TSG; they really are very good at that sort of thing. Vide for example the blue/ivory 218 they did - for free - including a redone 1980s cab, analog clock, Indusi 60 and all. And on Niddertal they didn't just slap in the DTG 363, they carefully backdated it as a 365.

    Here of course to be correct they would have to take it back another step, to 261 (i.e. original V 60(s)) configuration, but knowing them, they'll do it.
     
    • Like Like x 5
  12. Puddington Bear

    Puddington Bear Active Member

    Joined:
    Jul 24, 2024
    Messages:
    143
    Likes Received:
    247
    I agree. Although they said it's gonna be a steam / electric route, the map shows industrial branches and whatnot that still need shunting. And since we're not getting another steam engine for that task and the DB never had electric shunters, they will have to deliver it with a diesel shunter to make it work, before external layers.

    I've just grown a bit anxious when over the last year with TSW maybe.

    Let's hope for the best.
     
  13. solicitr

    solicitr Well-Known Member

    Joined:
    Jun 20, 2020
    Messages:
    13,780
    Likes Received:
    20,990
    Well, that's not entirely accurate. Although the funny little E 69s are associated with the Ammergaubahn they were built for, two of them spent a decade as shunters at Heidelberg (1954-64, so too early for this route, sadly)
     
  14. DominusEdwardius

    DominusEdwardius Well-Known Member

    Joined:
    Dec 8, 2016
    Messages:
    383
    Likes Received:
    605
    • Like Like x 1
  15. Tom Fresco

    Tom Fresco Well-Known Member

    Joined:
    Jan 13, 2021
    Messages:
    736
    Likes Received:
    1,785
    Because the phase out of steam and transfer to electric/ diesel didnt happen overnight.
    And for this route it will provide great variety, as if youd do a steam only route as the first, you then again have the problem of not being able to deliver as much new rolling stock as needed for a proper steam route. Like it was and is the problem with the UK steam routes, a transition era with early diesels wouldve been best there too for service and stock variety. Now theyre all rather empty because of tons of missing stock
    .
    I imagine youd be able to run the 023 alongside (hopefully backdated) 140s, 103, 194, 365, 218/215 and 110) with the existing silberlinge and umbauwagen as well as the Mittenwald and E94 freight stock, as well as any new coaches coming with this
     
  16. Puddington Bear

    Puddington Bear Active Member

    Joined:
    Jul 24, 2024
    Messages:
    143
    Likes Received:
    247
    Hence why I forgot about them (again). Of course you're completely right. We won't be getting one of these with the route for sure though, so DB V60 it will probably be.
     

Share This Page