Such a fine project marred by someone ignoring detail. A locomotive without cab lights on PlayStation has no handy L key. A busted lamp ? a Faulty switch ? The there is the marred speed restriction just South of Gatwick where the express to Brighton must cross points but gets a flash of 40 mph warning moments later. I have retired from Fortune 200 mission critical s/w dev. These are not the bugs that should slip thru QA. Hand both to an intern: she can fix it and test it. Or will owner Focus not drive such an eye for detail ? The farm tractor is again in the same furrows ... that reuse is comic. QA can miss that if not trained in VR. So much that is excellent ... but me left in the tunnel of darkness but for my clipboard lamp. Yes, it worked. Gauge lights, too. Vexed, a customer
Maybe English isn’t their first language and it’s a translation, it certainly reads like it. Ever thought about that?
Whatever the OP is trying to say there are much bigger unresolved issues with BML such as missing track at Redhill, the whole of Reigate and various stretches of unfenced line. If those haven’t been addressed by now they never will be, so certainly neither will the minor nitpicks.
He’s from Canada, or so it says on his other posts. https://forums.dovetailgames.com/threads/please-do-the-right-thing.72927/unread
As Vern says (well nearly) when I think of problems with LBN there are bigger things that spring to mind than what's said in this thread here.