Creation Sharing (fictional) Windwalder Regionalnetz

Discussion in 'PC Editor Discussion' started by Thijs053_NL, Aug 11, 2025.

  1. Thijs053_NL

    Thijs053_NL Well-Known Member

    Joined:
    Oct 12, 2018
    Messages:
    285
    Likes Received:
    788
    upload_2025-9-27_2-43-17.png
    upload_2025-9-27_2-43-50.png
    upload_2025-9-27_2-44-6.png
    Bahnhof kreutzhaven 100% done.
     
    • Like Like x 4
  2. traindpotter#1735

    traindpotter#1735 Member

    Joined:
    Oct 25, 2024
    Messages:
    36
    Likes Received:
    18
    The track will probably be released this month, that's really cool!

    Which DLCs are required to play it?
     
    • Like Like x 1
  3. Thijs053_NL

    Thijs053_NL Well-Known Member

    Joined:
    Oct 12, 2018
    Messages:
    285
    Likes Received:
    788
    i have tryed to pak it in but the editor stays crashing. The pack i needed also for me pc self to test.

    DLC's needed are:
    • Frankfurt S-Bahn
    • Hamburg-Lubeck (For the sV Signals)
     
    • Like Like x 1
  4. Laserdome#1690

    Laserdome#1690 Member

    Joined:
    Feb 22, 2024
    Messages:
    42
    Likes Received:
    12
    Hey, I wanted to ask about an preview stream. I know a YouTuber who would do it. Of course, he doesn't have the biggest reach, but they would really appreciate it if he could do an preview stream.
     
  5. Thijs053_NL

    Thijs053_NL Well-Known Member

    Joined:
    Oct 12, 2018
    Messages:
    285
    Likes Received:
    788
    The route is currently still under development, and no preview stream or video is being created. Too much is changing to allow for that.
    I'm also still working in the TSW5 editor. The TSW6 editor hasn't been released online yet.
    The TSW5 editor also has drawbacks. For example, the play-in editor no longer works. This is because I have the TSW6 base game and the TSW5 editor.
     
  6. bernhardjocke

    bernhardjocke Member

    Joined:
    Oct 10, 2021
    Messages:
    48
    Likes Received:
    20
    will you release route tomorrow I'm not sure I'm right I read this?
     
  7. Thijs053_NL

    Thijs053_NL Well-Known Member

    Joined:
    Oct 12, 2018
    Messages:
    285
    Likes Received:
    788
    No that is the set to TSW6. The route will release after 50% of the scenery. Than will come one beta online.

    The full release is mid/end 2026.
     
    • Like Like x 1
  8. Thijs053_NL

    Thijs053_NL Well-Known Member

    Joined:
    Oct 12, 2018
    Messages:
    285
    Likes Received:
    788
    This project is set over to TSW6.
     
    • Like Like x 2
  9. Thijs053_NL

    Thijs053_NL Well-Known Member

    Joined:
    Oct 12, 2018
    Messages:
    285
    Likes Received:
    788
    upload_2025-10-2_1-10-54.png
    upload_2025-10-2_1-12-2.png
    upload_2025-10-2_1-13-9.png
    upload_2025-10-2_1-13-18.png

    Neustadtlinden Süd(Bahnhof)
    Slowly but surely, the surrounding area is also starting to come together. The dike under the station will soon be replaced by a wall.
     
    • Like Like x 6
  10. Thijs053_NL

    Thijs053_NL Well-Known Member

    Joined:
    Oct 12, 2018
    Messages:
    285
    Likes Received:
    788
    The map has been completely revised. There were a few major bugs. The map has also become approximately 15 km longer. The changes were mainly made in Windwaldhausen. The S-Bahn tracks there now have an additional diversion option. The S-Bahn tracks have been increased from 2 to 4 at Windwaldhausen Ost. This was necessary to allow some S-Bahn lines to continue to Windwaldhausen Ost (from North Station). An option has also been added to connect the RE and RB tracks to the S-Bahn tracks. Some S-Bahn trains do not stop at all stations. The RB90 is now the S11 (it will not stop everywhere). The S3, 8, and 9 do run on the S-Bahn line. The S8 will run to Kreutzhaven between 5:00 and 9:00, and between 15:00 and 20:00. Between 9:00 and 15:00 and 20:00, it will only run to Windwaldhausen Ost. ----
    Kreutzhaven station will soon be getting an extra service from the Neustadtlinden side. The RB11 will run from there. It will run every half hour between 5:00 and 10:00 and between 15:00 and 20:00 between Neustadtlinden and Kreutzhaven, with an hourly service continuing to Windwaldhausen Nord.
    ---
    Windwaldhausen Hbf station will be undergoing major renovations. Space will be planned and created there to expand from 4 to 8 S-Bahn tracks, two of which will be on the upper level.
    ----
    Windwaldhausen Nord will also be modified. The platform switches (in the middle of the platforms) will be removed. This will eliminate planning errors and prevent the route from seeing 1200 route options instead of 120.
    ---
    Signaling will also be modified. The route will keep the form signals where they are currently located. However, these will be used slightly less frequently. At Windwaldhausen Ost, shape signals are being considered due to a major renovation there.
    ---
    Neustadtlinden station has also been modified. One platform and more sidings have been added, all in the same space. HV1968 signals have been chosen for Neustadtlinden.

    The curve between Neustadtlinden and Neustadtlinden Süd is no longer a 90-degree curve, but a 45-degree one. (This reduces timetable errors and improves placement.)
    ----
    Station names will remain the same. A few more will be added. These will be published online later.
    ---
    Timetable:
    The timetable can be made more complex and complex due to the adjustments. For example, on the S-Bahn, one route every 60 minutes can be introduced, but one every 30 minutes (Kreutzhaven will gain two additional platforms).
    - The RE will increase from every 45 minutes to every 30 minutes during peak hours. and to every 45 minutes outside rush hour.
    - The RB81 will be added between Neustadtlinden and Hohenblumendorf Hbf.
    - The ICE will run three times a day, and an IC once a day. By direction
    -- 6:00 am ICE11 Neustadtlinden -> Windwaldhausen Nord -> (Ai Drive on)
    -- 1:00 PM ICE13 Neustadtlinden -> Windwaldhausen Nord -> AI continue)
    -- 4:00 PM IC2099 Neustadtlinden -> Windwaldhausen Nord -> AI continue)
    -- 7:00 PM ICE15 Neustadtlinden -> Windwaldhausen Nord -> AI continue)
    Back:
    -- 7:00 am ICE10 Windwaldhausen Nord -> Neustadtlinden (After 10 minutes at the platform to Fern Clean Platform)
    -- 2:00 PM ICE12 Windwaldhausen Nord -> Neustadtlinden (After 10 minutes at the platform to Fern Clean Platform)
    -- 2:30 PM IC77778 Windwaldhausen Nord -> Neustadtlinden (Empty for IC2099)
    -- 6:00 PM IC2090 Windwaldhausen Nord -> Neustadtlinden (After 10 minutes at the platform to Fern Clean Platform)
    -- 8:00 PM ICE14 Windwaldhausen Nord -> Neustadtlinden (After 10 minutes at the platform to Fern Clean Platform)
    -- 11:00 PM ICE77777 Windwaldhausen Nord -> Neustadtlinden (Empty)
    Shunting and empty runs
    A few empty runs will also be added to the timetable. These include the first IC(E) run returning to its starting point. However, rolling stock will not always be in place, or when runs switch from peak-hour service to regular service and vice versa. The route will also run empty during off-peak hours.

    Freight:
    No freight runs are planned. There is room for some shunting runs and local freight. These trains are allowed to pass through the tunnel at Windwaldhausen Hbf. A dedicated line is being considered for this purpose.
    ---
    If you have any ideas, please let me know. Even if I've probably forgotten something, I'll come back to it later.
     
    • Like Like x 4
  11. Thijs053_NL

    Thijs053_NL Well-Known Member

    Joined:
    Oct 12, 2018
    Messages:
    285
    Likes Received:
    788
    upload_2026-2-20_16-41-36.png
    Windwladhausen ost V2
     
    • Like Like x 4
  12. Thijs053_NL

    Thijs053_NL Well-Known Member

    Joined:
    Oct 12, 2018
    Messages:
    285
    Likes Received:
    788
    Getting back to this. I've since tested it with the ICE and S-Bahn. The S-Bahn hasn't become any longer, but there is room for an extra stop. The ICE has become approximately 6 km longer. This is mainly due to a small adjustment in Windwaldhausen. This is mainly at the East Station. The train will stop at Windwaldhausen East.

    Sbahn:
    - S2 (Kreutzhaven)
    - S81 (Kreutzhaven Peak) Between 5 and 9, 15 and 19
    - S8 (Windwaldhausen East)
    - S9 (Kreutzhaven)
    - AI: S1 (Airport), S4 (Falkenberg Main Station)

    Regional:
    - RB 80 (Neustadtlinden 'Once per hour')
    - RB 81 (Kreutzhaven via the Sbahn 'Once per hour during peak hours only')
    - RE 2 (Neustadtlinden 'Once every 45 minutes, every 30 minutes during rush hour')
    - AI: RE1 Zilverdam Centraal (NL), RB98 (Waldenburg Main Station), IC(E)200-210 (Zilverdam Centraal NL)

    Fern
    IC and ICE trains pass through here.

    The AI will be available for players in Version 2.
    It has been decided to split the RB90 into two routes (which would otherwise be 190 km long). This will now be split in two at Waldenburg Hauptbahnhof.

    There are approximately 120 to 150 operational timetables. Between 100 and 150 AI journeys are planned.

    The Sbahn will operate 24/7. There are also currently plans to build a tunnel for some Sbahn lines.

    An airport will be added as a bonus in V2. This will expand the operational timetables by 200.

    The S-Bahn will also run from Kreutzhaven (new S10 route) to the airport (this will create a 5-minute service between Kreutzhaven and Windwaldhausen).

    S-Bahn Rolling Stock
    - S2 BR430
    - S81 BR423
    - S8 BR423
    - S9 BR422

    All S-Bahn trains will be operated with BR422 and 430.
    ---
    - RB80 BR425
    - RB81 BR642
    - RE 2 BR111 + Dostos
    - AI: BR425, 442, 111-Dostos
    ---
    Spring reinforcement Neustadtlinden - Hohenblumendorf Hbf (formerly to Windhaldhausen Nord) BR110 + N-cars.
    ---
    Shunting Windhaldhausen Ost, Hbf, Nord It will be primarily operated by a BR140 (because it's a small, compact locomotive, allowing it to operate on short sections).
    ---
    The BR101 Expert will operate the IC. It will initially be operated to Neustadtlinden by a BR140 (where it will be pushed to the cleaning platform and then returned empty).
     
    • Like Like x 2
  13. Thijs053_NL

    Thijs053_NL Well-Known Member

    Joined:
    Oct 12, 2018
    Messages:
    285
    Likes Received:
    788
    upload_2026-4-18_10-4-46.png
    On this project is not a lot changed.
    only the placing of the OHLE and the New signal (Off) for the next version
     
    • Like Like x 1
  14. Thijs053_NL

    Thijs053_NL Well-Known Member

    Joined:
    Oct 12, 2018
    Messages:
    285
    Likes Received:
    788
    First timetable is planned.
    S12 Kreutzhaven -> Windwaldhausen-Ost. Ones per hour. I'm now planning the RE75 Neustadtlinden - Windwaldhausen-Ost

    To come back on the timetable and running trains.

    There will be a little change

    S-Bahn:

    - S2 BR430 (Stays) Runnes now to Windwaldhausen Nord (This was Hbf)
    - S81 BR423 (Goes Away.)
    -- S81 is now S12 (With BR430) (Kreutzhaven -> Windwaldhausen Ost)
    - S8 BR423 (Stays) Kreutzhaven - Windhaldhausen Nord
    - S9 BR422 (Stays) Kreutzhaven - Windwaldhausen Ostkreuz (V2)
    -- S9 in V1 until Hbf

    Added:
    - S21 Kreutzhaven -> Windwaldhausen Hbf (Tief)
    - S15 Neustadtlinden -> Windhaldhausen Nord (Via RE Tracks)
    - S75 Windhaldhausen Hbf (Tief) - Neustadtlinden (Last Train) And first Train

    Regional:
    - RB 80 (Neustadtlinden -> Hohenblumendorf 'Once per hour')
    -- This is now RB97 (BR642
    - RB 81 (Kreutzhaven - Windwldhausen ost via the Sbahn 'Once per hour during peak hours only')
    -- This is now S12 and will run the hole day now.
    - RE 2 (Neustadtlinden 'Once every 30 minutes.
    Added:
    - RB97 Neustadtlinden - Hohenblumendorf (BR642)

    Timetable
    05 am -> 10 am every 30 min
    10 am -> 2 pm every 60 min*
    2 pm -> 8 pm every 30 min
    8 pm -> 01 am every 60 min*
    * In Combination with RE75 every 30 min
    )
    - NEW: RE75: every 60 min between Neustadtlinden and Windhaldhausen ost (S-Bahn) . Runnes between 6 am and 9 pm
    - AI: RE5 Neustadtlinden - Dutch border,
     
    • Like Like x 1
  15. Thijs053_NL

    Thijs053_NL Well-Known Member

    Joined:
    Oct 12, 2018
    Messages:
    285
    Likes Received:
    788
    upload_2026-4-20_13-47-41.png upload_2026-4-20_13-47-56.png

    in Windwaldhausen is now also a DB Alt Zugen location
     
    • Like Like x 2
  16. solar#8682

    solar#8682 Member

    Joined:
    Jul 28, 2024
    Messages:
    34
    Likes Received:
    85
    Looks great, good luck with building!
     
    • Like Like x 1
  17. Thijs053_NL

    Thijs053_NL Well-Known Member

    Joined:
    Oct 12, 2018
    Messages:
    285
    Likes Received:
    788
    Its realy fun to make a fictional route for TSW :D Only -point is that the roads are not getting nicer :( I have to place tracks first and than the roads and remove the tracks again)

    I can also say at this moment:
    There are over 300 timetable rides :o
    200 for S-Bahn 104 for RE, RB, IC, ICE, And there are 15 with the BR110 with the n-wagons. :D
     
    • Like Like x 1
  18. Thijs053_NL

    Thijs053_NL Well-Known Member

    Joined:
    Oct 12, 2018
    Messages:
    285
    Likes Received:
    788
    upload_2026-4-22_13-45-17.png
    The update of windwaldhausen hbf is started
    This is 3 floors high with tracks and 1 floor with stores. Maybe is there also place for a 4th floor with tracks :D
     
    • Like Like x 1
  19. Thijs053_NL

    Thijs053_NL Well-Known Member

    Joined:
    Oct 12, 2018
    Messages:
    285
    Likes Received:
    788
    upload_2026-4-22_15-19-0.png
    North Junction (Updated)
    Here are 3 lines
    1. Windwaldhausen Hbf - Nord
    2. Windwaldhausen Hbf - Südringstraße (Diesel)
    3. Windwaldhausen Hbf - Westbahnhof
     
    • Like Like x 1
  20. Thijs053_NL

    Thijs053_NL Well-Known Member

    Joined:
    Oct 12, 2018
    Messages:
    285
    Likes Received:
    788
    upload_2026-4-23_0-27-16.png
    Track 11-14 and 21-24 junction
    Reason for one underground is that a 9 km from here is a Fern yard
     
    • Like Like x 2
  21. Thijs053_NL

    Thijs053_NL Well-Known Member

    Joined:
    Oct 12, 2018
    Messages:
    285
    Likes Received:
    788
    upload_2026-4-24_21-25-24.png
    The north station is starting te get his right track laying :cool: its a but to complex i think:|
     
    • Like Like x 4
  22. solar#8682

    solar#8682 Member

    Joined:
    Jul 28, 2024
    Messages:
    34
    Likes Received:
    85
    Looks incredible, keep it up!
    (Lekker bezig!)
     
    • Like Like x 1
  23. Thijs053_NL

    Thijs053_NL Well-Known Member

    Joined:
    Oct 12, 2018
    Messages:
    285
    Likes Received:
    788
    I can say at this moment already. From nord station are over 400 services planned. almost 300 S-Bahn and other 100 RE,RB IC,ICE for player drive!

    There is also space for around 400 AI services and 75 Shunting witn the BR294 and BR140.

    the station nord is almost done. I need still a lot of signals. Around 250 Shunting signals to go. I have already placed ovet 200 signals at north station.

    In the tunnel is also a junction made. That is a complex one. But there is almost no space to make it. So its verry short with a lot of up and downs and signals on places where it is hard to see.
     
    • Like Like x 1

Share This Page