Is the tsc one good
The fact that people don’t want reused locos
No I won’t, and I have as much right not to buy it as you do. If there’s a problem with that then it yours and not mine
This will possibly be the worst route to ever come to tsw. Short route, overpriced, locos that no one has asked for, and yet another rushed route
Speak or learn?
I didn’t specifically call you out for this argument, I just pointed out how it was pathetic that people were arguing like this. No individual...
How is an argument about what the best selling route is relevant to the class 700? Exactly, it’s not. Let’s all just leave it be and get back to topic
Can people stop suggesting dlc for content that isn’t even out yet
Ok… That’s great for you, But for people who do look outside and see rain on only one carriage, it brakes immersion
Why is this not reported more often, if at all. Rain only falls on the windows of the front carriage, the rest are completely untouched
What’s the hype around gwe?
As I said before, the BML timetable was made with space left for a 700, so it would be logical to layer the 700/0 as it does run some services...
That’s what I said
I’d rather see the north Kent line extended from dartford to London Bridge to give thameslink and class 465s a bit of extra track to run on
Cheers for the detail
Went on the 700 yesterday, made me look forward to it even more in tsw
SEHS uses the 700/0 BML uses the 700/1
Gen 9 isn’t capable then?
No one said it’s coming to BML
It was cjp#8580 who replied first
Yes I have MATE. But an area up north such as York would be more likely to come first
I suggest the north Kent line, with an extension from dartford to London Bridge Stations: Slade Green Abbey Wood Plumstead Woolwich Arsenal...
It is as a layer but only if you buy it 15£ with Boston route
We had a route to Birmingham very recently, I think other areas of England need to be looked at first
To add variety we should get an extension from Brighton main line to London Bridge and the Lewes branch
We don’t want gimmicks, we want good dlc
Too many UK routes in tsw Other countries should be added first
8
GCC is Glasgow Cathcart Circle
It’s very wip
Give me a justified reason why dtg wouldn’t make us pay for something twice
Elizabeth line only has 1 loco
April has 30 days. It’s the 4th
Bit stereotypical of you to say so
Separate names with a comma.