I hope the new US locomotive will be a Metro North P32AC-DM with Shoreliner push pull coaches for the Harlem Line. If this is added, I can see...
You're welcome, I think it might be due to the platform. I played the service from a PC. I play with ATC and the safety alert systems enabled on...
I tried service # 616 but have not tried 618. For me, 616 has been fixed in TSW3 and I can make it to Grand Central Terminal to complete the...
I just saw Intel just revealed their new ARC series GPU's. So far, the Intel ARC A770 GPU looks like a good deal. It appears to hover somewhere...
The propulsion of the LIRR M7 when accelerating sounds much better than before (now almost identical to the Metro North M7A) but it's doesn't...
[ATTACH] Track Crew repairing a down Catenary line due to tree damage just before the signal. Route: Amtrak NEC: Washington DC to Baltimore...
[ATTACH] LIRR M7 at Atlantic Terminal-Barclays Center preparing to start it's run to West Hempstead Equipment: LIRR M7 Route: Long Island Railroad
[ATTACH] Metro North M7A semi express train on the Park Avenue Viaduct to North White Plains on a cold winter evening. Next stop is Harlem-125th...
I agree, the performance is still bad on the LIRR route and the AI M7 has a break sound on when it's running. Also, the M7 propulsion is barely...
I have also been experiencing crashes with the new TSW3 routes. Upon trying to load a scenario, either the game will crash to the desktop with a...
I have been doing some more research on PC components lkately and almost have a finalized list but may make some more changes between now and...
[ATTACH] A semi express Metro North M3A on the way to Grand Central during the snow squall Route: Harlem Line Equipment: Metro North M3A
I notice a bit of an improvement over the default TSW2 LIRR M7 sounds. The new sounds for both the M3 and M7 are very similar to what is featured...
Great to see the audio for the LIRR M7 and M3 has been revamped and the route received some TLC with the new sounds and dynamic weather
I think it is possible for them to extend the Long Island Railroad if they really wanted to, as they extended the Southeastern route that came out...
Thanks, I have tried the above but it did not restore my progress. Unfortunately, it looks like I am going to have to replay the scenarios. I have...
I hope the propulsion of the LIRR m7 gets fixed since it has been broken since it was first released and the audio lag issues that stem from the...
I just launched Train Simulator and it appears I have lost my progress from the career & standard scenarios. Has anyone experienced this? I just...
[ATTACH] Here, we have a full consist on it's way to GCT, originating from Danbury for the morning peak service Equipment: Metro North Shoreliner...
Definitely a great suggestion. I really think the devs can definitely take the route further east atleast to Ronkonkoma at some point. If they can...
Thanks for confirming these issues will be fixed in TSW3. It appears there will be further updates to TSW2 as well while TSW3 becomes the primary...
Do you have the source for that confirmation? If confirmed, then that is ridiculous. While the route looks great, it should have undergone further...
I just tried 3 other services on the Harlem line. I notice at some point along the run, there is an AI train just ahead of the junction or...
[ATTACH] Local and Express Services bound for Penn Station on the LIRR Main Line Route: Long Island Railroad Equipment: LIRR M7
I am not sure if I missed the roadmap notes from previously but I thought I saw the issue with the AI train getting stuck on the track was on the...
[ATTACH] Class 484 arriving at Ryde St. John Route: Islw of Wright 2022 Equipment: Class 484
Thanks for the suggestion. I agree, the PSU could come in handy to use for a new system. To have 1000W sitting and gathering dust while it has...
My PSU is an old sleeper potato. Good ol reliable for 9 years now Motherboard: Gigabyte GA-UD3-970A CPU: AMD Phenom II X4 965 BE @ 3.4Ghz...
I hope AMD plans to release Zen4 for the AM4 platform as well. But if they go the AM5 route specifically, then the cost of building a new computer...
I am actually curious if a core i5 12600KF would suffice for running rail simulation. I am sure it would as I am coming from an AMD Phenom II X4...
Hi everyone, thank you for the suggestions. I really appreciate the advice. Here is my take based on the provided suggestions. Calidore266: For...
I just tried out a career scenario and quick drive scenario. This M7 has more controls than the M7A that came out for the Hudson line. This route...
Hi everyone, I am currently looking for advice/opinions on possible system builds, I am currently in the process of looking to upgrade my computer...
Awesome screens, I am definitely looking forward to this route
What are you referring to? Currently, the NJT Bergen Line is included in the workshop route that was previously posted.
[ATTACH] Evening Peak Express Train arriving at Sharon station Route: Boston Sprinter Loco: MBTA F40PH-3C
[ATTACH] End of the journey. Metro North train completing the end of it's passenger service at Grand Central Terminal Route: Metro North Harlem...
Unfortunately, the LIRR GP38 is no longer in passenger service. I believe they may have been converted into freight equipment for the NY&A. They...
Agreed, if the M3's, C3, DE/DM30, MP15AC, and NY&A GP38-2 are introduced, that can introduce many service patterns and fully simulate the rolling...
I recently heard approximately 80 LIRR M3's have been brought out of storage and put back into service, I believe until 2024 or so. I think they...
I think we may soon see an M3 if this route was ported from TSW. I wonder why they didn't include the diesels as it was heavily requested before
It is good to see this is arriving in Train Simulator but crazy after all the complaints with the TSW version, the route should atleast go further...
This is amazing. So glad to see LIRR finally make it's way to TSC. I can't wait to run this route in. Hopefully it extends east of Hicksville....
[ATTACH] 2 switcher locomotives at idle at the CEMOF Depot Equipment: Caltrain MP15-DC Route: Peninsula Corridor
[ATTACH] LIRR M3 at Hillside Support Facility for maintenance Route: Long Island Railroad Loco: LIRR M3
[ATTACH] MBTA F40PH-3C arriving at Canton Center on a rainy spring evening Route: Amtrak NEC: Boston Sprinter Loco: MBTA F40PH-3C
I just experienced the same thing on PC with train #616. On the PC platform, I was operating an M3 running express from White Plains to...
[ATTACH] Metro North Metropolitan EMU's approaching the Mott Haven WYE. Equipment: Metro North M3A Route: Harlem Line
Separate names with a comma.