There are ICE services that go from Koln HBF via Wuppertal HBF and Hagen HBF that go to Berlin HBF so an extension for rro could potentially link...
They can definitely do that
DTG would never charge $40 though :)
Oakville was made way before they developed their new tech though. When it came out for tsw2020, it was badily riddled with bugs to the point...
DTG has said numerous times that the price won't change because of route length. Now with the new tech that they developed, prices for a 100 mile...
They said in a stream that the reason why ts routes are being made for tsw2 is due to the pandemic. Now this route could've been planned pre-covid...
I do agree with what you are saying, but the reason why this is happening is because of the pandemic. They already have the resources to make...
I do own the ts version and it's a blast well not in terms of the speed because this is not really a high speed route for the majority of the route
Someone in the community though was able to link up the two routes though with no problems at all though. So linking up rro and rsn is not impossible
For some people, mastery works fine but for some like me it doesn't work at all. I guess it's not a suprise that it doesn't track progress for me...
I support the idea of the route.
DTG have said that they will not upgrade the gwe route to meet modern standards. Yes it would be cool but it's not going to happen
I don't see the point of that if dtg don't have the eurostar license.
Looks nice. The art work looks nice as well although I wish the passengers that are inside the trains as shown by the artwork were actual...
Agreed
Precisly. Things such as multiplayer, an editor. Things that they kept saying would come but have not come at all for understandable reasons of...
And hey if people don't want more lirr content, they don't have to buy it
Welcome to the forums mate
It is annoying to use a high speed train for 30-35 minutes. It would be cool if we can get a route where the service for a high speed train is an...
Fair point
and had more support than the m3
My bad lol :). I just search up these routes and the trains and they didn't peek my intrest. Maybe these routes will be popular to others though
I think if another underground route were to be made, dtg would have to make improvements to the dispatcher anyways. I agree with what you have...
I support this idea. It would be cool to get a full system instead of individual lines. Performance on last gen consoles might be a issue though
I don't like any of these options
I think the poll should've been named, "If another deep tube underground line was made, what would be your preferred deep tube underground line...
Oof
Sounds like your doing a marathon lol
That sounds like a good idea but then that would mean we should have the option if we were doing a passenger run to do the return journey so like...
I still have issues with mastery updating. I've completed the tier 1 part of mastery on the Bakerloo line and and did 5 services but for some...
I support this idea. It would be cool if we could do track maintenance in the timetable. It would add more to do besides hauling passengers from a...
Yeh but it's not ok when I can't play the LIRR because the sound issues are so bad on the m3/m7 to the point where it makes me and some others not...
Hopefully they will listen to your suggestion because that is something that I think would be great
That was probably the case but if we get another thing similar to this for tsw3 or tsw4, we can't get preserved collection routes ported to those...
I feel like they need to revert back to having the train power systems on instead of us having to turn them on on the ice on Koln Aachen because...
This is the reason why I spawn on foot and take over a service that I want to play 10 minutes before the service leaves because they simply don't...
This is a issue that happens on the DB BR 425 and the 422 as well at times where there is a white screen when I take over a service on foot in hrr...
None of us work for dtg and dtg don't tend to respond to the suggestions thread of the forums. The horn on the m7 needs to indeed be updated...
I still support the idea and if this route were to be made and if people don't like it, they are not entitled to buy it.
i don't expect extensions anytime soon
We can only dream. If dtg were a bigger company and had more money, then maybe we could actually get a full system like the Full DB S-Bahn...
Maybe the museum does have blueprints to the de30ac. Maybe if they do, the museum can give them info about the train if they do and the m3...
I agree and we would get the DE30AC since the branch isn't electrified from Mineola to Oyster Bay.
Oh this was a spam
I like that idea
It would be cool to get more DB S-Bahn Lines but to actually get the full line and not part of a line. Hopefully the new tech they made will make...
The lirr definitely needs major improvements. They got so many parts of this route wrong
I don't care about toilets either to be honest
The DB S-Bahn Rhein Rhur line S1 from Dortmund HBF to Solingen HBF in total is 60.5 miles with 39 stations in total and to me it's a shame that we...
I don't see the point of toilets unless we can actually use them
Separate names with a comma.