However, PZB is designed to account for braking distance; with 1-1.2 km between Vs and Hs, one can get down even from 160 km/h albeit with hard...
That's why I referred to what Sam called a "lightbulb moment"- DTG finally figuring out that customers are getting a little tired of recycling....
In other words, at least on PC LIRR isn't going to get any better than it was on Tuesday. :(
All right, here's three in one- and all three already exist in TS: 1) Munchen - Garmisch-Partenkirchen 2) Mittenwaldbahn (G-P - Innsbruck) 3)...
Possibly. However, if DTG have actually taken to heart their "light bulb moment" wrt diversity of rolling stock, I think it rather unlikely that...
GP7 is more likely; CRR only ever had two 9's
Funny, I just ran a GWE service and got full credit for Tier One
As long as EMD/Cat continue to make replacement parts for the 645 engine, those things will keep going. CSX is currently engaged in a...
What they said was that the "other half" of the patch would come out with Hamburg-Lubeck: that is, today.
The problem with that is that console content has to be purchased via the Microsoft or Playstation Stores- and they would be unlikely to honor a...
I would love to have an NW-2 just to do that convict-stripe livery
Good idea; not especially likely.
WARNING: make sure it's the folder named "DLC", not the folder labeled "Paks." That one is for core game stuff.
Apparently not. My LIRR .pak file was last modified on Tues May 11- nothing new today.
Why is that broken? You have to do those things now, you don't get credit for whatever you may have done before.
Today's patch quietly added Mastery challenges for MSB, GWE, NTP and perhaps others.
Which I find bizarre. In Germany even LZB trackage still has speedboards. On LIRR in the game it is far worse than that, because ATC is...
More specifically, if you want the taillights turned on at the back, choose "headlights" in your cab (the front)- the taillights then come on at...
That at least has been addressed in streams by Matt, as a problem that affects all of TSW2: since each piece of rolling stock, even static ones,...
Well, not exactly. Cement Circle for TSW2 was fixed quite some time back. What was released last week was a fix for it in TSW2020- which...
:D:D:D:D:D:D
No German route is going to be especially interesting as a standalone. Traffic comes from layers- which previously RT didn't even have. Now it does.
Who wants more driving in tunnels? If DTG were to extend LIRR (which they won't), far better they add the Oyster Bay or Babylon branches
The wiper control is over the window to your right
That's the nature of commuter and regional rail. Same thing, multiple times a day. That's how it works. I do regret the lack of depot...
At the time RT was released, the 1442 did run the full length. And the new version is a huge improvement in value over the old one, precisely...
I wouldn't hold my breath for a repeat of the GP40-2. Based on player demand, DTG would be leaving a heap of money on the pavement if they didn't...
This competition would be a bit more balanced if it were based on miles driven rather than services completed.
OTOH, the Port Washington trains at Penn Station bizarrely wind up across a switch, with the front of the train on the right side and the back...
Apparently making working PIS for trains is a very different affair from making static PIS for station platforms.
Actually, Thameslink, Southern & Great Northern is a single railway, one franchise under NR and one TOC, so if DTG have a license for the...
Since you're on PC, you can fix it easily enough. Just search the forums for "engine.ini"
The signals in LIRR are still hopelessly screwed up- certainly the interlockings and ABS do not work as they're supposed to, showing green Proceed...
That's not much of a defense: "It's just like a dangerously unsafe system from half a century ago." Not having PTC does not justify unsigned...
That's always been the case with the 143 (which "belongs" to RSN so was not part of the RT fixit pass)
It gets better: [IMG] Maybe not murder, but it isn't shoplifting either
Tees Valley Line has 2
Now this is a major mistake- far more than PIS layout: [IMG]
It's supposed to be AI only, it's not drivable
That's an Advance Approach Limited Medium Slow and Proceed signal.
It doesn't help that most US services take 90 or more minutes to complete
I don't know that including every intermediate stop, as in the ICEs' "crawl" display, is really necessary or all that much in demand. It's simply...
Whenever the new system is installed on those (hopefully during the MSB upgrade which is going on as we speak), then the Dostos, cab car and 146...
When operating trains practically nose to tail -as they do during peak hours- the station blocks are protected by Stop-and-Proceed signals: full...
Your point being, I take it, that having a 112 with the wrong size headlight is equally as wrong as having a GP38 on Hamburg-Lubeck instead....
What the heck is this? The Bronze Age? The UK? Any system which relies on driver memorization is hopelessly primitive and ought to be illegal....
Yes, I understand how it is supposed to work. The thing is, the TSW model of it does NOT work that way. In fact, doesn't work at all. More...
Not at all. Frequently the ATC is reading 15 or 20 where the HUD says 40.
90 days Yes
Main circuit breaker? Some are reporting that as an issue
Separate names with a comma.