13 May 2020 7:55-10:10 AM Continuation of tunneling works at Nichols. Temporary Testing of embankment lofts. (Berlin - Leipzig route will be...
12 May 2020 8:00-9:50 AM Minor Modifications at Bluementritt - Sta. Mesa Segment. (Both Temporary line and NSCR South) Minor Modifications at...
11 May 2020 8:45-10:45 AM Tracks placed until Sta. Mesa. No Superelevation implemented on Sta. Mesa - Paco Segment of NSCR South due to its...
10 May 2020 8:05-9:20 AM Reworking Bluementritt Station following the OpenRailwayMap diagram. Works for Solis Station-Bound track. Fixed...
8 May 2020 Marker Update Markers for NSCR South on making. Tabang Marker becomes Guiguinto Station. Guiguinto Marker becomes Tuktukan Station....
6-7 May 2020 6 May 2020 (Follow-up) Working on Valenzuela Train Depot. 7 May 2020 (8:10-11:30 AM) Continuation of work at Valenzuela Train...
4-6 May 2020 4 May 2020 (Follow-up) Ignore the "External Link" given last night. Use the "Updated Version v4.3x+" link to download the...
3-4 May 2020 3 May 2020 (Follow-up) Track laying and Viaduct laying between the temporary end of NSCR to: Bicutan (Track) and Nichols (Viaduct)....
3 May 2020 Marker "Edsa MCC/NSCR NB/SB" changed to "Edsa MCC NB". Temporary removal of Speed Limit markers between Bluementritt and Edsa for...
Seem's you don't have the LGV: Marseille - Avignon Route, which is required for the Extension. Mark
1 May 2020 Replacing Catenary on removed NSCR Segments from Tutuban and Bluementritt. Signal Testing on NSCR Tutuban to Solis and Bluementritt....
29-30 April 2020 April 29 New Marker Update: Guiguinto Malolos (Located after Longos Flyover towards Calumpit) Mabalacat Train Depot (Located...
28 April 2020 Reviewing the markers before converting to .kml and TS-tools (RW Tools) (sucessfully converted) Markers Modified: Subic - Clark...
28 April 2020 --The Comeback of Route Building-- Segments Overhauled: Tutuban NSCR Station, Solis Triangle, Bluementritt Tracks joined...
PNR South Long Haul Gumaca Segment (New) [ATTACH] PNR South Long Haul Lopez Alignment (New indicated in Green, Alt. indicates the current Bicol...
PNR Subic - Clark Railway (Subic - Floridablanca Segment): [ATTACH] PNR Subic - Clark Railway (Floridablanca to Clark Logistics and Future...
27 April 2020 --More Preparations for Continuing the route building since 25-26 April 2020-- Preparations ongoing for the extension of the route....
26 April 2020 More testing on a custom route about mixed signals. Practicing before implementation. (PZB to AWS, PZB to TVM, AWS to TVM, and...
Is "Auto Braking" enabled? This can be found in Settings -> Gameplay Settings. On Southwest China High Speed Network route (Required): Ensure...
25 April 2020 Note: This is a Follow-up from April 24 Important Announcement. Examined Hamburg - Hanover and London to Brighton routes how to...
24 April 2020 Important Announcement The route building will continue starting 27 April 2020 after 2.5 months suspension. The following will...
There is another issue I found not just the NJT U34CH and Im Koblitzer Bergland. Found the red X on Konstanz - Villingen Route Extension....
15 March 2020 --Follow up to previous 13 March 2020 announcement-- As per advice by my mother, I had to stay in Manila instead of staying into...
13 March 2020 Test Run Announcement Test runs will be SUSPENDED for 30 to 40 days beginning March 14. Had to go to province temporarily, and stay...
Since the closure of virtual railroads (old) website last year, the link to download of the Ebula Helper throws a 404 error. Now I have plans to...
9 March 2020 (Follow-up) Scenarios for Class 390 S9BL on Valley Corridor will divide into packs. Can range from 15-20 scenarios. Once Class 222...
Class 390 High-Caliber Matchup (Valley Corridor)(Free Roam) Notes: This picture below has Class 390 VT which is retired, but I cloned the free...
Same here, tried to replicate the same issue [ATTACH] any fix? I Have the EU Loco and Asset Pack.
9 March 2020 --Route Building Still Suspended, but Test Runs Continue-- Purchased DLC Valley Corridor Class 390 S9BL New Limitations/Driving...
27 February 2020 --Changes of Schedule on Rolling Stock Test Run-- March 1 Schedule SUSPENDED because of a scheduled trip. March 7 and 8 will...
26 February 2020 After a Trip to Iloilo and Nueva Ecija last week, I am back home in Rizal Province. I had to rest until Today. I'm back again to...
Scenario: (PILIPINAS) [ICE 3 BR406] PNR Test Trials Part 1 (Custom) Duration: 95 min. Route: LGV Rhone - Alpes and Mediteranee Route Extension...
14 February 2020 --Test Run Period Expiry Statement-- The test runs of Rolling Stock using this route will continue as 3rd Round on 15 February...
12 February 2020 --Test Run Period Expiry Statement-- The test runs of Rolling Stock using this route will continue as 2nd Round starting later...
6 February 2020 For Proper identity of the depot of NSCR in Valenzuela, Placed put 4 Pylons from KHS asset on the area. Changes in Schedules...
6 February 2020 Proposed Valenzuela Depot on NSCR (Consult on Slide 16 on this presentation). Pylons from KHS placed for proper identity. [ATTACH]
5 February 2020 North-South Commuter Railway Construction of NSCR North Phase 1 Started. Added Platforms on NSCR Solis. Signals placed on...
5 February 2020 New segment between Tutuban and Gov. Pascual has been constructed. The stations are: Solis C3 Asistio Avenue Caloocan Gov....
4 February 2020 Added missing speed warn post on NSCR España NB. (Facing South) Signals moved at Tutuban North due to road crossing. Added speed...
4 February 2020 Limitation: NSCR Track update on Tutuban Triangle becomes single due because it was removed due to signals stuck at red. [ATTACH]
To turn Steam's auto-login off upon PC startup, please see below: Source: https://support.steampowered.com/kb_article.php?ref=5344-QWBN-3580...
Workarounds for this to launch the game in x64 Version: Select "No" once prompted, then click "Save" on Settings Menu Press "Quit Game" on Main...
1 February 2020 Fixed broken Super-Elevation on NSCR SB past Sta. Mesa. Added tracks on Tutuban. Limitations Tutuban Triangle on NSCR bound to...
31 January 2020 Route Building Aborted due to ISP Upgrade -- Resumption tomorrow 1 February 2020
30 January 2020 Moved track marker "Alabang Switchback SB" due to road crossing block. Terrain adjustment on Identified river (Poblacion) before...
30 January 2020 2 Rivers Identified (1 in Muntinlupa and 1 in Biñan) during construction. Here's the Update on Biñan River Bridge [ATTACH]
29 January 2020 Change of Bridge lofts due to low clearances. Cabuyao: [ATTACH] Mamatid and Calamba: [ATTACH]
29 January 2020 All U-Bahn Signals replaced with UK LED Signals following issues. Added speed posts on NSCR Viaduct Segment. Added speed posts...
28 January 2020 Working around on some signals stuck on red at NSCR-Tutuban.* Test runs of DB BR 425 Expert-Line and Class 170/171 Continues....